Article 16 Measures installed at band E, F or G social housing
A measure meets the condition in this article if—
(a)
the measure is installed as part of an ECO4 project at social housing for which the pre-project SAP band is band E, F or G; and
(b)
the measure is—
(i)
an insulation measure;
(ii)
a renewable heating system, except where it replaces a renewable heating system of the same kind at the domestic premises;
(iii)
a first time heating system;
(iv)
a district heating connection; or
(v)
an innovation measure.