Article 27 General requirements relating to heating measures
A heating measure meets the requirements of this article if—
the measure is not—
the installation of equipment for the generation of heat wholly or partly from coal; or
the installation of a connection to a district heating system that delivers heat generated wholly or partly from coal;
where the measure is the installation of equipment for the generation of heat wholly or partly from biofuel, oil or liquefied petroleum gas, the measure—
is installed at off-gas premises;
is a repair of a central heating system; and
complies with the off-gas heating hierarchy in article 30;
where the measure is the installation of a connection to a district heating system that delivers heat generated wholly or partly from biofuel, oil or liquefied petroleum gas, the measure—
is installed at off-gas premises;
is a repair of the district heating connection; and
complies with the off-gas heating hierarchy in article 30;
where the measure is the installation of equipment for the generation of heat wholly or partly from mains gas, or the installation of a connection to a district heating system that delivers heat generated wholly or partly from mains gas, the measure is installed at on-gas premises;
where the measure is the installation of an electric storage heater, but is not a repair, the measure—
has a responsiveness rating equal to, or greater than, 0.8 when assessed against the Standard Assessment Procedure; and
replaces an electric heating system at the premises or is installed at premises where one or more electric storage heaters are already installed;
where the measure is the installation of an electric heating system, but is not a repair, the measure—
has a responsiveness rating equal to, or greater than, 0.8 when assessed against the Standard Assessment Procedure; and
replaces an electric heating system at the premises or is installed at premises where one or more electric storage heaters are already installed;
where the measure is the installation of a central heating system or a district heating connection not referred to in sub-paragraph (f), but is not a repair, the measure is an efficient heating system;
where the measure is the installation of a boiler, but is not a repair—
it is an efficient boiler; and
where the boiler forms part of a wet central heating system, hydraulic balancing of the central heating system is carried out following the installation of the boiler;
where the measure includes the installation of equipment for the direct conversion of sunlight into electricity, the measure is installed at domestic premises—
at which there is already installed—
a hydronic heat pump; or
an electric storage heater or an electric heating system that in either case has a responsiveness rating equal to, or greater than, 0.8 when assessed against the Standard Assessment Procedure; or
at which there is installed as part of the same ECO4 project as the measure—
a hydronic heat pump;
an electric storage heater, that meets the requirements of sub-paragraph (e)(i) and (ii); or
an electric heating system, that meets the requirements of sub-paragraph (f)(i) and (ii);
where the measure is the installation of equipment for the generation of heat wholly or partly from biomass, the measure—
is installed at premises which are in a rural area; and
generates heat from biomass which is wholly woodfuel; and
where the measure is the replacement of an efficient boiler with another efficient boiler, the boiler being replaced is broken down and is not economically repairable.
In paragraph (1)—
-
“hydraulic balancing” means the carrying out of steps to ensure the temperature difference is the same between the inlet and outlet of each radiator, or other heat emitter, in a heating system;
-
“mains gas” means a supply of the kind mentioned in section 5(1)(b) of the Gas Act 1986f1;
-
“woodfuel” has the same meaning as in paragraph 6 of Schedule 4A to the Renewable Heat Incentive Scheme Regulations 2018f2.
Annotations
Footnotes
- f1
-
Section 5 was substituted by section 3(1) of the Gas Act 1995 (c. 45). Relevant amendments were made by section 108 of, and Schedule 2 to, the Utilities Act 2000 and S.I. 2012/2400.
- f2
-
S.I. 2018/611, amended by S.I. 2021/76. There are other amending instruments, but none is relevant.