Article 66 Interpretation: definitions related to formulae
In this Chapter—
-
“BFR” is “the building fabric repair increase” and is the amount determined in accordance with article 74 (addition to the annual cost savings for certain qualifying actions incurring building fabric repair expenditure);
-
“C” is—
- (a)
1.1, where the qualifying action meets the condition in article 21 (measures accompanied by a declaration from a relevant authority or participant and Secretary of State approval);
- (b)
otherwise, 1;
- (a)
-
“D” is 0.8 (being a deflator for a partial project score);
-
“F” is—
- (a)
0.2, where the floor area of the domestic premises is less than 73m2;
- (b)
0.1, where the floor area of the premises is between 73m2 and 97m2 (both inclusive); and
- (c)
0, where the floor area of the premises is greater than 97m2;
- (a)
-
“IM” is the amount determined in accordance with article 73 (addition to the annual cost savings for certain innovation measures);
-
“KM” is the determined cost savings for the qualifying action in question;
-
“OGR” is—
- (a)
0.35, where the domestic premises are—
- (i)
off-gas premises; and
- (ii)
in a rural area in Scotland or Wales;
- (i)
- (b)
otherwise, 0.
- (a)