# The Electricity and Gas (Energy Company Obligation) Order 2023, Article 30: Calculating the score for ECO4A qualifying actions


(1) The score to be given to an ECO4A qualifying action is to be calculated in accordance with the following formula—
KM x (1 + IM + R).
(2) In paragraph (1)—
(a) “KM” is the annual cost savings of the ECO4A qualifying action determined in accordance with the methodology published by the Administrator under article 32;
(b) “IM” has the value determined in accordance with article 31;
(c) “R” is—
(i) 0.2, where the ECO4A qualifying action is—
(aa) a low-income qualifying action; and
(bb) installed at off-gas premises in a rural area in Scotland or Wales;
(ii) otherwise, 0.
(3) In this article, “off-gas premises” and “rural area” have the meanings given in article 2(1) of the 2022 Order.

---
Source: https://www.legislation.gov.uk/ukdsi/2023/9780348248340/article/30 (the official version)
Page: https://openlegislation.uk/draft-electricity-and-gas-energy-company-obligation-order-2023/article-30
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.