Paragraph 14 Regulation 15 (general eligibility criteria)
In regulation 15, for paragraph (4) substitute—
“(4)The second condition is—
(a)in the case of a generating CMU or an interconnector CMU, that the connection capacity of the CMU is equal to or greater than 2MW (the “minimum capacity threshold”); or
(b)in the case of a demand side response CMU, that the DSR capacity of the CMU is equal to or greater than the minimum capacity threshold.”.