OpenLegislation

Paragraph 14 Regulation 15 (general eligibility criteria)

Original text. Later amendments are not shown.

In regulation 15, for paragraph (4) substitute—

“(4)

The second condition is—

(a)

in the case of a generating CMU or an interconnector CMU, that the connection capacity of the CMU is equal to or greater than 2MW (the “minimum capacity threshold”); or

(b)

in the case of a demand side response CMU, that the DSR capacity of the CMU is equal to or greater than the minimum capacity threshold.”.