# The Electricity Network Codes and Guidelines (System Operation and Connection) (Amendment etc.) (EU Exit) Regulations 2019, Paragraph 104


(1) Article 160 is amended as follows.
(2) In paragraph 3—
(a) for point (a), substitute—
“(a) there shall be sufficient positive reserve capacity on RR to restore the required amount of positive FCR and positive FRR;”;
(b) for point (b), substitute—
“(b) there shall be sufficient negative reserve capacity on RR to restore the required amount of negative FCR and negative FRR;”.

---