Regulation 22 Form and content of permits
A permit must be granted by SEPA in writing and must specify—
the activity authorised;
the authorised person;
any conditions (including any standard conditions) to which the permit is subject;
the date on which the permit takes effect; and
the authorised place.
SEPA may specify in a permit that the permit ceases to have effect on a specified date.
In granting a permit, SEPA may impose such conditions as it thinks fit including, in particular, either or both—
standard conditions;
an off-site condition in accordance with schedule 2.
SEPA may impose standard conditions in a permit by specifying the standard conditions which are to be conditions of the permit.
A reference in a permit to standard conditions is to the conditions as revised from time to time.
Where a standard condition is inconsistent with any other condition of a permit, the other condition shall prevail to the extent of that inconsistency.
Schedule 2 has effect in relation to off-site conditions.