# The Environmental Permitting (England and Wales) (Amendment) Regulations 2013, Regulation 49: Schedule 9 (waste operations)


(1) Schedule 9 to the principal Regulations is amended as follows.
(2) In paragraph 3(2), in the definition of “relevant waste operation” in paragraph (a) omit “Part A mobile plant or”.
(3) For sub-paragraph 3(3)(b) and (c) substitute—
“(b) the disposal of hazardous waste (other than by incineration or landfill) in a facility with a capacity of more than 10 tonnes per day;
(c) the recovery of hazardous waste falling within sub-paragraph (i) to (v), (viii) or (x) of paragraph (a) of Part A(1) of Section 5.3 of Part 2 of Schedule 1;
(d) the disposal of non-hazardous waste falling within paragraph (a) of Part A(1) of Section 5.4 of Part 2 of Schedule 1;
(e) the recovery or a mix of recovery and disposal of non-hazardous waste falling within paragraph (b) of Part A(1) of Section 5.4 of Part 2 of Schedule 1;
(f) temporary or underground storage of hazardous waste falling within Part A(1) of Section 5.6 of Part 2 of Schedule 1.”.
(4) In paragraph 3(4), after paragraph (a) omit “and” and at the end insert—
“, or
(c) is an exempt waste operation”.

---
Source: https://www.legislation.gov.uk/ukdsi/2013/9780111533185/regulation/49 (the official version)
Page: https://openlegislation.uk/draft-environmental-permitting-england-and-wales-amendment-regulations-2013/regulation-49
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

