# The Environmental Permitting (England and Wales) Regulations 2007, Regulation 71: Transitional provision: conversion of PPC permits resulting from applications in relation to existing Part A installations and mobile plant


(1) This regulation applies to an application for the grant of a PPC permit which falls within paragraph (2).
(2) An application falls within this paragraph if—
(a) it was outstanding at the relevant time; and
(b) the operation to which the application relates is carried on at an installation or by means of mobile plant which was at the time of the application an existing Part A installation or mobile plant.
(3) A PPC permit granted on the determination of an application to which this regulation applies becomes an environmental permit on the determination date and must be treated as if it was granted under regulation 13(1).
(4) In this regulation, “existing” and “determination date” have the meanings given at the relevant time by paragraph 6 of Schedule 3 to the 2000 Regulations.

---
Source: https://www.legislation.gov.uk/ukdsi/2007/9780110788760/regulation/71 (the official version)
Page: https://openlegislation.uk/draft-environmental-permitting-england-and-wales-regulations-2007/regulation-71
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

