Paragraph 21 Preparatory treatments of waste plant matter
(1)
Subject to sub-paragraph (2),—
(a)
chipping, shredding, cutting or pulverising waste plant matter, including wood or bark; or
(b)
sorting and baling sawdust or wood shavings,
on any premises.
(2)
An operation does not fall within sub-paragraph (1) unless—
(a)
it is carried on for the purposes of recovery or reuse; and
(b)
no more than 1,000 tonnes of such waste is dealt with on those premises in any period of 7 days.
(3)
Storage of waste in connection with an operation mentioned in sub-paragraph (1) at the premises where it is carried on if the total amount of waste stored at those premises does not at any time exceed 1,000 tonnes.