Production of Cement and Lime Production of Cement and Lime
-
Part A(1)
- (a)
Producing cement clinker or producing and grinding cement clinker.
- (b)
Producing lime—
- (i)
in kilns or other furnaces with a production capacity of more than 50 tonnes per day; or
- (ii)
if the activity is likely to involve the heating in any 12-month period of 5,000 or more tonnes of calcium carbonate or calcium magnesium carbonate or both in aggregate.
- (i)
- (a)
-
Part A(2)
- (a)
Unless falling with Part A(1) of this Section, grinding cement clinker.
- (b)
Unless falling within Part A(1) of Section 2.1 or 2.2, grinding metallurgical slag in plant with a grinding capacity of more than 250,000 tonnes in any 12-month period.
- (a)
-
Part B
- (a)
Storing, loading or unloading cement or cement clinker in bulk prior to further transportation in bulk.
- (b)
Blending cement in bulk or using cement in bulk other than at a construction site, including the bagging of cement and cement mixtures, the batching of ready-mixed concrete and the manufacture of concrete blocks and other cement products.
- (c)
Slaking lime for the purpose of making calcium hydroxide or calcium magnesium hydroxide.
- (d)
Producing lime where the activity is not likely to involve the heating in any 12-month period of 5,000 or more tonnes of calcium carbonate or calcium magnesium carbonate or both in aggregate.
- (a)