Paragraph 3 Grant of an environmental permit for a relevant waste operation: requirement for prior planning permission
Following an application under regulation 13(1), the regulator must not grant an environmental permit that relates to a relevant waste operation if—
use of the site for carrying on the relevant waste operation requires planning permission or development consent under the Planning Act 2008f1; and
no such permission or consent is in force.
In this paragraph—
-
“planning permission” means planning permission under the Town and Country Planning Act 1990f2 and includes—
- (a)
a certificate under section 191 of that Actf3, and
- (b)
an established use certificate under section 192 of that Act, as originally enacted, which continues to have effect for the purposes of subsection (4) of that section; and
- (a)
-
“relevant waste operation” means—
- (a)
a waste operation that is not carried on at an installation or by means of Part A mobile plant or Part B mobile plant, or
- (b)
a specified waste management activity.
- (a)
In sub-paragraph (2)(b), “specified waste management activity” means one of the following activities—
the disposal of waste in a landfill falling within Section 5.2 of Part 2 of Schedule 1;
the disposal of waste falling within Section 5.3 of Part 2 of Schedule 1;
the recovery of waste falling within Part A(1)(c)(i), (ii), (v) or (vii) of Section 5.4 of Part 2 of Schedule 1.
But “specified waste management activity” does not include any activity specified in sub-paragraph (3)(b) or (c) if that activity—
is carried on at the same installation as a Part A(1) activity not specified in sub-paragraph (3); and
is not the activity which constitutes the primary purpose for operating the installation.