# The Environmental Permitting (England and Wales) Regulations 2016, Paragraph 8: Minor works on or affecting bridges and culverts


(1) The carrying out of minor works on or affecting bridges and culverts for highways and public rights of way (“minor works”).
(2) For the purposes of this paragraph, the specific conditions are—
(a) the minor works do not affect, or have the potential to affect, the bed, banks, water level, normal flow or flood flow in the main river,
(b) equipment associated with the minor works is not stored on the bed or banks of the main river, and
(c) no works are carried out from the main river or from the banks of the main river.

---
Source: https://www.legislation.gov.uk/ukdsi/2016/9780111150184/schedule/25/part/2/crossheading/descriptions-and-conditions/paragraph/8 (the official version)
Page: https://openlegislation.uk/draft-environmental-permitting-england-and-wales-regulations-2016/schedule-25/part-2/crossheading-descriptions-and-conditions/paragraph-8
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

