OpenLegislation

Part 4 Exempt flood risk activities: descriptions and conditions

Original text. Later amendments are not shown.

  1. 1General and interpretation
  2. 2Electrical cable services
  3. 3Service crossings below the bed of a main river
  4. 4Service crossings attached to the outside of existing structures over a main river
  5. 5Footbridges
  6. 6Temporary scaffolding in England
  7. 7Temporary dewatering in England
  8. 8Maintenance of raised river or sea defences
  9. 9Maintenance of structures within the channel of a main river
  10. 10Drinking bays
  11. 11Access platforms
  12. 12Outfalls
  13. 13Repair and protection of banks using natural materials
  14. 14Repair of bank slips and erosion
  15. 15Channel habitat structures made of natural materials
  16. 16Rafts for surveys
  17. 17Gravel-cleaning for fish-spawning beds
  18. 18Placement of stones or logs in a main river in England for habitat enhancement
  19. 19Eel pass devices
  20. 20Fish passage notches
  21. 21Removal of silt, sand and other material in England
  22. 22Removal of silt and sand adjacent to in-river structures in England
  23. 23Dredging of man-made ditches, land drains, agricultural drains and previously straightened watercourses in England
  24. 24Dredging of any main river in England
  25. 25Excavation of scrapes and shallow wetland features
  26. 26Raised flood defences in England
  27. 27Bankside wildlife refuge structures
  28. 28Improvement works for tracks and paths