Part 4 Exempt flood risk activities: descriptions and conditions
- 1General and interpretation
- 2Electrical cable services
- 3Service crossings below the bed of a main river
- 4Service crossings attached to the outside of existing structures over a main river
- 5Footbridges
- 6Temporary scaffolding in England
- 7Temporary dewatering in England
- 8Maintenance of raised river or sea defences
- 9Maintenance of structures within the channel of a main river
- 10Drinking bays
- 11Access platforms
- 12Outfalls
- 13Repair and protection of banks using natural materials
- 14Repair of bank slips and erosion
- 15Channel habitat structures made of natural materials
- 16Rafts for surveys
- 17Gravel-cleaning for fish-spawning beds
- 18Placement of stones or logs in a main river in England for habitat enhancement
- 19Eel pass devices
- 20Fish passage notches
- 21Removal of silt, sand and other material in England
- 22Removal of silt and sand adjacent to in-river structures in England
- 23Dredging of man-made ditches, land drains, agricultural drains and previously straightened watercourses in England
- 24Dredging of any main river in England
- 25Excavation of scrapes and shallow wetland features
- 26Raised flood defences in England
- 27Bankside wildlife refuge structures
- 28Improvement works for tracks and paths