Regulation 6 Timetable
The proceedings at the referendum are to be conducted in accordance with the following table.
| Proceeding | Time |
|---|---|
| Publication of notice of referendum | Not later than the 25th day before the day of the referendum |
| Notice of poll | Not later than the 15th day before the day of the referendum |
| Hours of polling | Between 7am and 10pm on the day of the referendum |