# The Greenhouse Gas Emissions Trading Scheme (Amendment) Order 2025, Article 13: Article 3 amended (reporting requirements)


(1) Article 3 is amended as follows.
(2) After paragraph 1 insert—
“1a. Where an installation is an FA installation at the date on which a sub-installation of the installation ceases operation, the operator of the installation must report on the activity level of each sub-installation of the installation in the scheme year of cessation (even if the installation is not an FA installation after the end of that scheme year).”.
(3) In paragraph 2 for “contain information on whether any sub-installation has ceased operation” substitute “, where all operations have ceased at a sub-installation, contain the information referred to in paragraph 9”.
(4) After paragraph 8 insert—
“9. Where at the date on which the activity level report is prepared all operations have ceased at a sub-installation, the information that the activity level report is required to contain is the following:
(a) the date of the cessation;
(b) whether or not the operator intends for operations to resume at the sub-installation;
(c) where the operator does intend for operations to resume at the sub-installation, each of the following:
(i) the date by which the operator expects those operations to resume;
(ii) whether :
(aa) the sub-installation is technically capable of resuming those operations without physical changes being made; or
(bb) the operator intends for the technical capability required for those operations to resume to be restored at the sub-installation.”.

---
Source: https://www.legislation.gov.uk/ukdsi/2025/9780348266597/article/13 (the official version)
Page: https://openlegislation.uk/draft-greenhouse-gas-emissions-trading-scheme-amendment-order-2025/article-13
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

