# The Investigation and Commencement of Repair (Scotland) Regulations 2026, Regulation 4: Modification of the right to repair


(1) The 2002 Regulations are modified as follows.
(2) In regulation 2 (interpretation), after the definition of “the Act”, insert—
““competent person” means a person who, in the reasonable opinion of the landlord, has the skills and experience necessary to determine whether a qualifying repair is required in relation to regulation 8A,”.
(3) In regulation 8 (procedure for notification of and carrying out qualifying repairs), in the opening words, for “Where a tenant”, substitute “Subject to regulation 8A, where a tenant”.
(4) After regulation 8 insert—
“Repairs to remove damp and mould
8A (1) This regulation applies where a tenant notifies a landlord, or the landlord otherwise becomes aware, that the tenant’s house is or may be affected by damp or mould.
(2) Regulations 5 and 8(a) do not apply.
(3) The landlord must ensure that an investigation is completed by a competent person within the period of 10 working days beginning with the day after the day on which the landlord is notified, or otherwise becomes aware of the damp or mould, to determine whether a qualifying repair is required.
(4) The landlord must give the tenant a written summary of the results of the investigation, within the period of 3 working days beginning with the day after the day on which the investigation is completed.
(5) If the investigation identifies that a qualifying repair is required, the landlord must ensure that the qualifying repair is commenced by the primary contractor within the period of 5 working days beginning with the day after the day on which the investigation is completed.
(6) The landlord must ensure that following a qualifying repair—
(a) the house is substantially free from damp and mould, and
(b) so far as reasonably practicable, the house will continue to be substantially free from damp and mould.
(7) The period in paragraph (3) is suspended for so long as there are circumstances, beyond the control of the landlord which prevent the investigation being completed.
(8) The period in paragraph (5) is suspended for so long as there are circumstances, beyond the control of the landlord which prevent the qualifying repair being commenced.
(9) Where the period specified in paragraph (3) or (5) is suspended under paragraph (7) or (8), as the case may be, the landlord must—
(a) give notice to the tenant specifying—
(i) that the period specified in paragraph (3) or (5), as the case may be, is suspended, and the reason why, and
(ii) the period within which the investigation is to be completed or, as the case may be, the qualifying repair is to be commenced,
(b) ensure that, until the landlord is able to comply with the duty, reasonable steps are taken where practicable to minimise the extent to which the house is affected by damp or mould.
(10) For the avoidance of doubt, regulation 8(b) and (c) continues to apply.”.
(5) In regulation 9 (failure to provide access), for “regulation 8” substitute “regulation 8 or 8A”.
(6) In regulation 10 (maximum period), for paragraph (2), substitute—
“(2) The maximum period starts on the first working day after—
(a) the date of receipt of notification of the qualifying repair by the landlord,
(b) where the landlord inspects the house under regulation 8(a), the date of inspection, or
(c) where regulation 8A applies, the date the qualifying repair is commenced under regulation 8A(5).”.
(7) In regulation 12 (compensation)—
(a) in paragraph (1), for “paragraph (2)” substitute “paragraphs (2) and (5)”,
(b) after paragraph (1) insert—
“(1A) Where the competent person has failed to investigate the damp or mould by the end of the period specified in regulation 8A(3), and that period has not been suspended in accordance with regulation 8A(7), the landlord must pay the tenant a sum of compensation calculated in accordance with paragraphs (3) and (5).
(1B) Where the primary contractor has failed to commence the qualifying repair by the end of the period specified in regulation 8A(5), and that period has not been suspended in accordance with regulation 8A(8), the landlord must pay the tenant a sum of compensation calculated in accordance with paragraphs (4) and (5).”,
(c) in paragraph (2)(b), “, subject to a maximum amount of compensation of £100” is omitted,
(d) after paragraph (2), insert—
“(3) The amount of compensation referred to in paragraph (1A) is the sum of—
(a) £15, and
(b) £3 for every working day, if any, in the period beginning on the day after the day on which the period in regulation 8A(3) ended and ending with the day on which the investigation is completed under regulation 8A(3).
(4) The amount of compensation referred to in paragraph (1B) is the sum of—
(a) £15, and
(b) £3 for every working day, if any, in the period beginning on the day after the day on which the period in regulation 8A(5) ended and ending with the day on which the qualifying repair is commenced under regulation 8A(5).
(5) The maximum amount of compensation payable under paragraphs (2), (3) or (4) is £100 and compensation may be paid under each paragraph.”.
(8) In the schedule (defects, repairs of which are qualifying repairs and maximum time for completion)—
(a) at the bottom of column 1 (defect), insert “Substantial damp or mould.”,
(b) at the bottom of column 2 (maximum period in working days from date immediately following the date of notification of qualifying repair or inspection), insert “20”.

---
Source: https://www.legislation.gov.uk/sdsi/2026/9780111065594/regulation/4 (the official version)
Page: https://openlegislation.uk/draft-investigation-and-commencement-of-repair-scotland-regulations-2026/regulation-4
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

