Paragraph 3 Timetable
The proceedings at the referendum are to be conducted in accordance with the following Timetable.
Timetable
Proceedings | Time |
|---|---|
| Publication of notice of referendum | Not later than the twenty-fifth day before the day of the referendum. |
| Notice of poll | Not later than the sixth day before the day of the referendum. |
| Polling | Between the hours of 7 in the morning and 10 at night on the day of the referendum. |