{
  "url": "https://openlegislation.uk/draft-nuclear-safeguards-eu-exit-and-fees-amendment-regulations-2026/schedule",
  "json_url": "https://openlegislation.uk/draft-nuclear-safeguards-eu-exit-and-fees-amendment-regulations-2026/schedule.json",
  "legislation": "ukdsi/2026/9780348282702",
  "legislation_title": "The Nuclear Safeguards (EU Exit and Fees) (Amendment) Regulations 2026",
  "legislation_url": "https://openlegislation.uk/draft-nuclear-safeguards-eu-exit-and-fees-amendment-regulations-2026",
  "path": "schedule",
  "kind": "schedule",
  "number": null,
  "heading": "Substitution of Part 1 of Schedule 1 to the Nuclear Safeguards (EU Exit) Regulations 2019",
  "text": "“Part 1\nQuestionnaire for the Declaration of Design Information for a Qualifying Nuclear Facility\nA. Conversion and Fuel Fabrication Facilities\nGeneral Information\n1 Name of qualifying nuclear facility (including any usual abbreviation);\n2 Location, postal address, telephone number and e-mail address;\n3 Owner (legally responsible person);\n4 Operator (legally responsible person);\n5 Description (main features only);\n6 Purpose;\n7 Status (e.g. planned, under construction, in operation, shutdown, closed down, decommissioned for safeguards purposes);\n8 Construction schedule dates (if not in operation): start of construction, commissioning, operation;\n9 Normal operating mode (days only, number of shifts; number of days/year, etc.);\n10 Facility layout (drawings showing structural containment, fences, access, qualifying nuclear material storage areas, laboratories, waste disposal areas, routes followed by qualifying nuclear material, experimental and test areas, etc.);\n11 Siting of facility (maps showing location, premises and perimeter of site, other buildings, roads, railways, rivers, etc.);\n12 Titles and addresses of persons responsible for accountancy and control of qualifying nuclear material and contact with the Agency (if possible, provide organisation charts showing the position of persons).\nOverall Process Parameters\n13 Facility description (indicating important items of equipment which use, produce or process qualifying nuclear material, all process stages, storage areas and feed, product and waste points, as relevant to the measurement, accountancy and control of qualifying nuclear material) and general flow diagram (indicating equipment, hoods, cells, areas which contain qualifying nuclear material and those specific areas where hold-up of qualifying nuclear material can occur);\n14 Process description (indicating type of conversion, method of fabrication, sampling methods, etc. and the modification of physical and chemical forms);\n15 Design capacity (tonnes/year of uranium, plutonium and/or thorium);\n16 Anticipated annual throughput (in the form of a forward programme indicating the proportion of various feeds and products);\n17 Other important items of equipment using, producing or processing qualifying nuclear material, if any (e.g. testing and experimental equipment).\nQualifying Nuclear Material Description and Flow\n18 Description of main qualifying nuclear material: provide the following for all feed, intermediate product (powder, pellets, etc. separately stored or shipped) and product—\ni) main types of accounting units to be handled in the facility (drums, elements, bundles, etc.);\nii) chemical and physical form (for product include types of fuel element/assemblies, detailed description of general structure and overall structure, overall dimensions of fuel elements/assemblies, including qualifying nuclear material content and enrichment), with drawings;\niii) throughput, uranium enrichment ranges or plutonium content, or thorium content (for normal flowsheet operation, indicating if blending and/or recycling takes place);\niv) batch size/flow rate and campaign period; means of batch identification;\nv) storage and facility inventory (indicating any change with throughput);\nvi) frequency of receipt or shipment (batches/units per month);\n19 Scrap material;\n20 Waste material: describe for each waste stream (including contaminated equipment, measured discards and retained waste)—\ni) major contributors (sources);\nii) types of waste;\niii) chemical and physical form (liquid, solid, etc.);\niv) estimated enrichment ranges and uranium/plutonium content;\nv) estimated quantities per year, period of sorting;\nvi) waste generated rates (as percentage of input/throughput, quantities per month);\nvii) store inventory range and maximum capacity;\nviii) method and frequency of recovery/disposal;\n21 Waste treatment system (with diagrams);\n22 Other qualifying nuclear material in the facility (if any) and its location (with diagrams);\n23 Schematic flowsheet for qualifying nuclear material (identifying sampling points, flow and inventory measurement points, accounting areas, inventory locations, etc.);\n24 Categories, form and ranges of qualifying nuclear material content (including enrichment, as applicable) and ranges of quantities of qualifying nuclear material flow for each qualifying nuclear material handling area (i.e. process area, storage area, other locations), including maximum quantities of qualifying nuclear material to be handled in accounting areas at any one time;\n25 Recycling processes: describe any such processes giving source and form of qualifying nuclear material, method of storage, normal inventory, frequency of processing, duration of temporary storage, schedules for any external recycling and measurement method of fissile content of recycled qualifying nuclear material (with diagram);\n26 Inventory:\ni) in-process (within facility and equipment during normal operation, indicate quantity, range of enrichment, plutonium content, form and principal locations and any significant change in time or throughput; indicate anticipated residual hold-up and mechanism, e.g. plate out, condensation);\nii) feed and product storages;\niii) other locations (quantity, range of enrichment, plutonium content, form and location of inventory not already specified).\nHandling of Qualifying Nuclear Material (For Each Accounting Area)\n27 Containers, packaging and storage area description: for feeds, products and wastes, describe the type and size of storage and shipping containers and packaging used (including nominal capacity, capacity for normal operation and type of material), method of storage or packing, filing and emptying procedures, shielding and any special identification features (with drawings);\n28 Methods and means of transfer of qualifying nuclear material (including equipment used for handling of feed, product, waste);\n29 Transportation routes followed by qualifying nuclear material (with reference to facility layout), with diagrams;\n30 Shielding (for storage, transfer and process areas);\n31 Maintenance, decontamination, clean-out: describe plans and procedures for decontamination and clean-out of equipment containing qualifying nuclear material, defining all sampling and measurement points associated with the following (or in cases where clean-out and/or sampling is not possible, indicate how the hold-up of qualifying nuclear material is measured or calculated)—\ni) normal facility maintenance;\nii) facility and equipment decontamination and subsequent recovery of qualifying nuclear material;\niii) facility and equipment clean-out including means of ensuring vessels are empty;\niv) facility start-up and facility shutdown (if different from normal operation).\nProtection and Safety Measures\n32 Basic measures for physical protection of qualifying nuclear material;\n33 Specific health and safety rules for inspector compliance.\nAccountancy and Control of Qualifying Nuclear Material\n34 System description: describe the qualifying nuclear material accountancy system; method of recording and reporting accountancy data and establishing material balances; frequency of material balances; and procedures for account adjustment after physical inventory, mistakes, etc., under the following headings (include specimen forms for all procedures)—\ni) General: state what general and subsidiary ledgers will be used, their form (hard copies, tapes, microfilms, etc.) and who has responsibility and authority; identify the source data (e.g. shipping and receiving forms, internal transfer documents, physical inventory forms, initial recording of measurements and measurement control sheets); describe procedures for making adjustments, the source data and records and how adjustments are authorised and substantiated;\nii) Receipts (including method of dealing with shipper/receiver differences and subsequent account corrections, the checks and measurements used to confirm qualifying nuclear material content and the persons responsible for those determinations);\niii) Shipments (products, waste, measured discards);\niv) Physical inventory: describe procedures (including basic inventory approach, i.e. planning, organising and conducting the inventory, prelisting, use of prior measurement data, who has primary responsibility, how process clean-out is accomplished, accountancy of process residual hold-up), scheduled frequency, estimated distribution of qualifying nuclear material, methods of operator’s inventory taking (both for item and/or bulk accountancy, including relevant assay method), accessibility and possible verification method for qualifying nuclear material, expected accuracy and access to qualifying nuclear material and list major items of equipment regarded as qualifying nuclear material containers;\nv) Measured discards (method of estimation of quantities per year/month, method of disposal);\nvi) Retained waste (method of estimation of quantities per year, method and envisaged period of storage, possible subsequent uses);\nvii) Unmeasured losses (indicate the methods used to estimate unmeasured losses);\nviii) Operational Records and Accounts (including logbooks, general ledgers, internal transfer forms, method of adjustment or correction, retention location, languages, control measures and responsibility for records);\n35 Features related to containment and surveillance measures (general description of applied or possible measures in reference to floor plan or facility layout);\n36 For each flow and inventory measurement point, and sampling points of accounting areas (including those identified under questions 13, 23 and 24), provide the following—\nTotal number of measurement points:\ni) description of location, type, identification;\nii) expected types of inventory change at the measurement point;\niii) whether the measurement point can be used for physical inventory taking;\niv) physical and chemical form of qualifying nuclear material (including enrichment range, plutonium content and cladding materials description);\nv) qualifying nuclear material containers, packaging and method of storage;\nvi) sampling procedure and equipment used (including number of samples taken, frequency and rejection criteria);\nvii) measurement/analytical methods and equipment used and corresponding accuracies;\nviii) source and level of random and systematic errors for feed, product, scrap, waste (weight, volume, sampling, analytical);\nix) calculative and error propagation techniques;\nx) technique and frequency of calibration of equipment used, and standards used;\nxi) programme for the continuing appraisal of the accuracy of weight, volume, sampling and analytical techniques and measurement methods;\nxii) programme for statistical evaluation of data from (x) and (xi);\nxiii) method of converting source data to batch data (standard calculative procedures, constants and empirical relationships for feed, products in sub-accounting areas, waste and scrap);\nxiv) means of batch identification;\nxv) anticipated batch flow rate per year;\nxvi) anticipated number of inventory batches;\nxvii) anticipated number of items per flow and inventory batches;\nxviii) category, composition and quantity of qualifying nuclear material per batch (including batch data, total weight of each element of qualifying nuclear material and form of qualifying nuclear material);\nxix) features related to containment and surveillance measures;\n37 Overall limit of accuracy: describe procedures to combine individual measurement error determination to obtain the overall limit of accuracy for—\ni) shipper/receiver differences;\nii) book inventory;\niii) physical inventory;\niv) material unaccounted for.\nPost-Operational Information\n38 Decommissioning schedule dates: end of operations, decommissioned;\n39 Facility decommissioning plan including:\ni) key events of the decommissioning plan;\nii) removal and recovery of qualifying nuclear material;\niii) removal or rendering inoperable of essential equipment.\nB. Critical and Subcritical Facilities\nGeneral Information\n1 Name of qualifying nuclear facility (including any usual abbreviation);\n2 Location, postal address, telephone number and e-mail address;\n3 Owner (legally responsible person);\n4 Operator (legally responsible person);\n5 Description (main features only);\n6 Purpose;\n7 Status (e.g. planned, under construction, in operation, shutdown, closed down, decommissioned for safeguards purposes);\n8 Construction schedule dates (if not in operation): start of construction, commissioning, operation;\n9 Normal operating mode (days only, number of shifts; number of days/year, etc.);\n10 Facility layout (drawings showing structural containment, fences, access, qualifying nuclear material storage areas, laboratories, waste disposal areas, routes followed by qualifying nuclear material, experimental and test areas, etc.);\n11 Siting of facility (maps showing location, premises and perimeter of site, other buildings, roads, railways, rivers, etc.);\n12 Titles and addresses of persons responsible for accountancy and control of qualifying nuclear material and contact with the Agency (if possible, provide organisation charts showing the position of persons).\nGeneral Storage Data\n13 Number of critical assemblies in the facility and their location (with drawings);\n14 Expected maximum operating power;\n15 General information on:\ni) moderator;\nii) reflector;\niii) blanket;\niv) coolant;\nv) important items of equipment which use, produce or process qualifying nuclear material.\nDescription of Qualifying Nuclear Material\n16 Main categories of qualifying nuclear material/fuel and the nominal weight of qualifying nuclear material in the facility;\n17 Fuel enrichment range and plutonium content;\n18 Description of fuel elements (for each type):\ni) physical and chemical form of fuel;\nii) geometrical form or type;\niii) dimensions;\niv) number of slugs per element;\nv) quantity of qualifying nuclear material and fissionable isotopes (with design tolerance);\nvi) composition of alloy, etc.;\n19 Description of cladding material:\ni) thickness;\nii) composition of material;\niii) bonding;\n20 Sub-assemblies of fuel (number of fuel elements per nuclear assembly, arrangement of fuel elements in sub-assembly, configuration and nominal weight of qualifying nuclear material per sub-assembly, with design tolerance), with drawings;\n21 Basic operational accounting unit (fuel elements/assemblies, etc.), with drawings;\n22 Other types of units (e.g. test or specially instrumented assemblies, fuelled pilot rod);\n23 Means of qualifying nuclear material/fuel identification;\n24 Other qualifying nuclear material in the facility (each separately identified);\n25 Core diagram (for each critical assembly showing the general disposition, core support structure, shielding and heat removal arrangements, channels for fuel elements or sub-assemblies, control rods, moderator, reflector, beam tubes, dimensions, etc.);\n26 Ranges of critical mass and maximum radius;\n27 Description of most common configurations (with drawings);\n28 Average mean neutron flux in the core:\ni) thermal;\nii) fast;\n29 Instrumentation for measuring neutron and gamma flux:\ni) accuracy and type of principal instruments;\nii) location of indicator and recorder;\n30 Diagram of radiation level outside/inside shielding at specified places;\n31 Maximum radiation dose rate of fuel blanket after refuelling (at the surface and at a distance of 1 metre);\n32 Schematic flowsheet for qualifying nuclear material for operator purposes (identifying measurement points, accounting areas, inventory locations, etc.);\n33 Inventory: state quantity range and approximate uranium enrichment and plutonium content for—\ni) qualifying nuclear material storage areas;\nii) core areas;\niii) assembly core;\niv) other locations;\n34 Qualifying nuclear material:\ni) packaging (description);\nii) storage plan and arrangements (with drawings);\niii) capacity of storage;\niv) qualifying nuclear material preparation (description and identification of layout and general arrangement);\n35 Drawings of fuel transfer equipment, if any;\n36 Routes followed by qualifying nuclear material (with drawings);\n37 Main equipment used for assembling, testing or measuring qualifying nuclear material.\nProtection and Safety Measures\n38 Basic measures for physical protection of qualifying nuclear material;\n39 Specific health and safety rules for inspector compliance.\nAccountancy and Control of Qualifying Nuclear Material\n40 System description: describe the qualifying nuclear material accountancy system; method of recording and reporting accountancy data; and procedures for account adjustment after inventory change and for correction of mistakes, etc., under the following headings (include specimen forms for all procedures)—\ni) General;\nii) Receipts;\niii) Shipments;\niv) Physical inventory: describe procedures, scheduled frequency, methods of operator’s inventory taking (both for item and/or bulk accountancy), including relevant assay methods and expected accuracy, access to qualifying nuclear material, methods of verification of qualifying nuclear material in the core and list major items of equipment regarded as qualifying nuclear material containers;\nv) Operational records and accounting records (including method of adjustment or correction, place of preservation and language);\n41 How often is the core disassembled to permit the verification of contained qualifying nuclear material?\n42 Features related to containment and surveillance measures (general description of applied or possible measures);\n43 For each measurement point of an accounting area identified under question 32, provide the following (if applicable) and attach drawings (if necessary):\nTotal number of measurement points:\ni) description of location, type, identification;\nii) anticipated types of inventory change and whether the measurement point can be used for physical inventory taking;\niii) physical and chemical form of qualifying nuclear material (with cladding materials description);\niv) qualifying nuclear material containers, packaging;\nv) sampling procedures and equipment used;\nvi) measurement methods and equipment used;\nvii) source and level of random and systematic errors (measurements);\nviii) technique and frequency of calibration of equipment used;\nix) method of converting source data to batch data;\nx) means of batch identification;\nxi) anticipated batch flow rate per year;\nxii) anticipated number of items per flow and inventory batch;\nxiii) category, composition and quantity of qualifying nuclear material per batch (including batch data, total weight of qualifying nuclear material in item and the isotopic composition (for uranium) and plutonium content, when appropriate; form of qualifying nuclear material);\nxiv) features related to containment surveillance measures.\nPost-Operational Information\n44 Decommissioning schedule dates: end of operations, decommissioned;\n45 Facility decommissioning plan including:\ni) key events of the decommissioning plan;\nii) removal and recovery of qualifying nuclear material;\niii) removal or rendering inoperable of essential equipment.\nC. Isotopic Enrichment Facilities\nGeneral Information\n1 Name of qualifying nuclear facility (including any usual abbreviation);\n2 Location, postal address, telephone number and e-mail address;\n3 Owner (legally responsible person);\n4 Operator (legally responsible person);\n5 Description (main features only);\n6 Purpose;\n7 Status (e.g. planned, under construction, in operation, shutdown, closed down, decommissioned for safeguards purposes);\n8 Construction schedule dates (if not in operation): start of construction, commissioning, operation;\n9 Normal operating mode (days only, number of shifts; number of days/year, etc.);\n10 Facility layout (drawings showing structural containment, fences, access, qualifying nuclear material storage areas, laboratories, waste disposal areas, routes followed by qualifying nuclear material, experimental and test areas, etc.);\n11 Siting of facility (maps showing location, premises and perimeter of site, other buildings, roads, railways, rivers, etc.);\n12 Titles and addresses of persons responsible for accountancy and control of qualifying nuclear material and contact with the Agency (if possible, provide organisation charts showing the position of persons).\nOverall Process Parameters\n13 Facility description (indicating important items of equipment which use, produce or process qualifying nuclear material, all process stages, storage areas and feed, product, tail and waste points) and general flow diagram;\n14 Process description (identifying sampling and key measurement points, material balance areas, inventory locations) and flowsheet for normal operation;\n15 Design capacity (throughput in tonnes of separative work units/year and maximum energy consumption in MW);\n16 Anticipated annual throughput (in the form of a forward programme indicating the proportion of various feeds and products).\nQualifying Nuclear Material Description and Flow\n17 Description of main qualifying nuclear material: provide the following for all feed, product and tails—\ni) chemical and physical form;\nii) throughput and enrichment ranges (for normal flowsheet operation indicating if blending and/or recycling takes place);\niii) batch size/flow rate and campaign period;\niv) maximum capability as concentration of top product (natural uranium feed);\nv) storage inventory (indicating any change with throughput);\nvi) frequency of receipt or shipment;\n18 Waste material:\ni) source and form (indicating major contributors; liquid or solid; range of constituents; enrichment range; include contaminated equipment);\nii) storage inventory range, method and frequency of recovery/disposal;\n19 Containers and storage area description: for feeds, products, tails and wastes, describe the type and size of containers (including operational capacity), method of storage, filing and emptying procedures (including time cycle) and any special identification features;\n20 Measured discards and retained waste (as a percentage of input);\n21 Inventory:\ni) in-process (within facility and equipment during normal operation, indicate quantity, form and main locations and any significant change with time or throughput);\nii) other locations (quantity, form and location of inventory not already specified).\nFacility Maintenance\n22 Maintenance, decontamination, clean-out: describe plans and procedures and define all sampling and key measurement points associated with the following—\ni) normal facility maintenance;\nii) facility and equipment decontamination and subsequent qualifying nuclear material recovery;\niii) facility and equipment clean-out including means of ensuring vessels are empty.\nProtection and Safety Measures\n23 Basic measures for physical protection of qualifying nuclear material;\n24 Specific health and safety rules for inspector compliance.\nAccountancy and Control of Qualifying Nuclear Material\n25 System description: describe the qualifying nuclear material accountancy system, method of recording and reporting accountancy data and establishing material balances and procedures for account adjustment after inventory change, mistakes, etc., under the following headings (include specimen forms for all procedures)—\ni) General;\nii) Receipts (including method of dealing with shipper/receiver differences and subsequent account corrections);\niii) Shipments (products and waste);\niv) Physical inventory: frequency, procedures, estimated distribution (list major items of equipment regarded as qualifying nuclear material containers);\nv) Measured Discards and Retained Waste;\nvi) Operational Records and Accounts (including method of adjustment or correction, place of preservation and language);\n26 For each key measurement point identified under questions 14 and 22, provide the following—\nTotal number of measurement points:\ni) identification;\nii) chemical and physical form of qualifying nuclear material;\niii) sampling procedure and equipment used;\niv) measurement/analytical method and equipment used;\nv) source and level of random and systematic errors (weighing, volume, sampling, analytical);\nvi) method of converting source data to batch data (standard calculative procedures, constants and empirical relationships);\nvii) calculative and error propagation technique;\nviii) technique and frequency of calibration of equipment used;\nix) programme for the continuing appraisal of the accuracy of weight, volume, sampling techniques and measurement methods;\nx) programme for statistical evaluation of data from (viii) and (ix);\n27 Features related to containment and surveillance measures (general description of applied or possible measures in reference to floor plan or facility layout);\n28 Overall limit of accuracy: describe procedures to combine individual measurement error determination to obtain the overall limit of accuracy for—\ni) shipper/receiver differences;\nii) book inventory;\niii) physical inventory;\niv) material unaccounted for.\nPost-Operational Information\n29 Decommissioning schedule dates: end of operations, decommissioned;\n30 Facility decommissioning plan including:\ni) key events of the decommissioning plan;\nii) removal and recovery of qualifying nuclear material;\niii) removal or rendering inoperable of essential equipment.\nD. Reprocessing Facilities\nGeneral Information\n1 Name of qualifying nuclear facility (including any usual abbreviation);\n2 Location, postal address, telephone number and e-mail address;\n3 Owner (legally responsible person);\n4 Operator (legally responsible person);\n5 Description (main features only);\n6 Purpose;\n7 Status (e.g. planned, under construction, in operation, shutdown, closed down, decommissioned for safeguards purposes);\n8 Construction schedule dates (if not in operation): start of construction, commissioning, operation;\n9 Normal operating mode (days only, number of shifts; number of days/year, etc.);\n10 Facility layout (drawings showing structural containment, fences, access, qualifying nuclear material storage areas, laboratories, waste disposal areas, routes followed by qualifying nuclear material, experimental and test areas, etc.);\n11 Siting of facility (maps showing location, premises and perimeter of site, other buildings, roads, railways, rivers, etc.);\n12 Titles and addresses of persons responsible for accountancy and control of qualifying nuclear material and contact with the Agency (if possible, provide organisation charts showing the position of persons).\nOverall Process Parameters\n13 Facility description (indicating important items of equipment which use, produce or process qualifying nuclear material, all process modification stages, storage areas and feed, product and waste points as relevant to the measurement, control and accountancy of qualifying nuclear material) and general flow diagram (indicating equipment, hoods, cells, areas which contain qualifying nuclear material and those specific areas where hold-up of qualifying nuclear material can occur);\n14 Process description (indicating the modification of physical and chemical forms);\n15 Design capacity (tonnes/year of uranium, plutonium and/or thorium);\n16 Anticipated annual throughput (in the form of a forward programme indicating the proportion of various feeds and products);\n17 Other important items of equipment using, producing or processing qualifying nuclear material, if any (e.g. testing and experimental equipment);\nQualifying Nuclear Material Description and Flow\n18 Description of main qualifying nuclear material: provide the following for all feed and product—\ni) main types of accounting units to be handled in the facility;\nii) chemical and physical form (for feed include types of fuel element/assemblies, describe general structure and overall dimensions of fuel elements/assemblies, including qualifying nuclear material content and enrichment), with drawings;\niii) throughput, uranium content and its enrichment ranges, plutonium content and thorium content, where applicable;\niv) batch size/flow rate and campaign period, means of batch identification;\nv) storage and facility inventory (indicating any change with throughput);\nvi) frequency of receipt or shipment (batches/units per month);\n19 Waste material (including contaminated equipment, measured discards and retained waste): for each waste stream, describe—\ni) major contributors (sources);\nii) type of waste after waste processing;\niii) chemical and physical form of waste feeds, intermediate storage and waste product after processing (liquid, solid etc.);\niv) for each material in point (iii), uranium and its enrichment ranges/plutonium content;\nv) estimated quantities per year, period of storing;\nvi) waste generated rates (as a percentage of input/throughput, quantities per month);\nvii) store inventory range and maximum capacity;\nviii) method and frequency of recovery/disposal;\n20 Waste treatment system (with diagrams);\n21 Other qualifying nuclear material in the facility (if any) and its location (with diagrams);\n22 Schematic flowsheet for qualifying nuclear material for operator purposes (identifying sampling points, flow and inventory measurement points, accounting areas, inventory locations, etc.);\n23 Categories, form and ranges of qualifying nuclear material content (including enrichment, as applicable), ranges of quantities of qualifying nuclear material flow for each qualifying nuclear material handling area (i.e. process area, storage area, other locations), including maximum quantities of qualifying nuclear material to be handled in accounting areas at any one time;\n24 Recycling processes: describe any such processes giving source and form of qualifying nuclear material, method of storage, normal inventory, frequency of processing, duration of temporary storage, schedules for any external recycling and measurement method for fissile content of recycled qualifying nuclear material (with diagram);\n25 Inventory:\ni) in-process (within facility and equipment during normal operation, indicate quantity, uranium content and its enrichment ranges, plutonium content, thorium content, if applicable, form and principal locations and any significant change in time or throughput; indicate anticipated residual hold-up and mechanism);\nii) feed and product storages;\niii) other locations (quantity, enrichment range, plutonium content, form and location of inventory not already specified).\nHandling of Qualifying Nuclear Material (For Each Accounting Area)\n26 Containers, packaging and storage area description: for feeds, products and wastes, describe the size and type of containers and packaging used; method of storage including fuel element locations, handling equipment and its capabilities; any special identification features (with drawings);\n27 Methods and means of transfer of qualifying nuclear material (including equipment used for handling of feed, product, recycled qualifying nuclear material and waste);\n28 Transportation routes followed by qualifying nuclear material (with reference to facility layout), with diagrams;\n29 Shielding (for storage and transfer).\nFacility Maintenance\n30 Maintenance, decontamination, clean-out: describe plans and procedures for decontamination and clean-out of equipment containing qualifying nuclear material (in cases where clean-out and/or sampling is not possible, indicate how the hold-up of qualifying nuclear material is measured or calculated), defining all sampling and measurement points associated with—\ni) normal facility maintenance;\nii) facility and equipment decontamination and subsequent qualifying nuclear material recovery;\niii) facility and equipment clean-out including means of ensuring vessels are empty;\niv) facility start-up and facility shut-down (if different from normal operation).\nProtection and Safety Measures\n31 Basic measures for physical protection of qualifying nuclear material;\n32 Specific health and safety rules for inspector compliance.\nAccountancy and Control of Qualifying Nuclear Material\n33 System description: describe the qualifying nuclear material accountancy system, method of recording and reporting accountancy data and establishing material balances, frequency of material balances, procedures for account adjustment after inventory change, mistakes, etc., under the following headings (include specimen forms for all procedures)—\ni) General: state what general and subsidiary ledgers will be used, their form (hard copies, tapes, microfilms, etc.) and who has responsibility and authority; identify the source data (e.g. shipping and receiving forms, initial recording of measurements and measurement control sheets); describe procedures for making adjustments, the source data and records and how adjustments are authorised and substantiated;\nii) Receipts (including method of dealing with shipper/receiver differences and subsequent account corrections; checks and measurements used to confirm qualifying nuclear material content and persons responsible);\niii) Shipments (products, waste, measured discards);\niv) Physical inventory: describe procedures (including basic inventory approach, i.e. planning, organising and conducting the inventory, prelisting, use of prior measurement data, who has primary responsibility for the inventory, how process clean-out is accomplished, accountancy of process residual hold-up), scheduled frequency, scheduled frequency, estimated distribution of qualifying nuclear material, methods of operator's inventory taking (both for item and/or bulk accountancy, including relevant assay method), accessibility and possible verification method for irradiated qualifying nuclear material, expected accuracy and access to qualifying nuclear material (list major items of equipment regarded as qualifying nuclear material containers);\nv) Measured discards (method of estimation of quantities per year/months, method of disposal);\nvi) Retained waste (method of estimation of quantities per year, method and anticipated period of storage; possible subsequent uses of retained waste);\nvii) Unmeasured losses (methods used to estimate unmeasured losses);\nviii) Operational Records and Accounts (including logbooks, general ledgers, internal transfer forms, method of adjustment or correction, retention location and language; control measures and responsibility for records);\n34 Features related to containment and surveillance measures (general description of applied or possible measures);\n35 For each flow and inventory measurement and sampling point of accounting areas identified under questions 13, 22 and 23, provide the following—\nTotal number of measurement and sampling points:\ni) description of location, type, identification;\nii) type of inventory change expected at the measurement or sampling point;\niii) whether the measurement or sampling point can be used for physical inventory taking;\niv) physical and chemical form of qualifying nuclear material (including enrichment range, plutonium content and cladding material description);\nv) qualifying nuclear material containers, packaging and method of storage;\nvi) sampling procedure and equipment used (including number of samples taken, frequency and rejection criteria);\nvii) measurement/analytical method and equipment used and corresponding accuracies;\nviii) source and level of random and systematic errors for feed, product, waste (weight, volume, sampling, analytical);\nix) calculative and error propagation technique;\nx) technique and frequency of calibration of equipment used and standards used;\nxi) programme for the continuous appraisal of the accuracy of weight, volume, sampling and analytical techniques and measurement methods;\nxii) programme for statistical evaluation of data from (x) and (xi);\nxiii) method of converting source data to batch data (standard calculative procedures, constants and empirical relationships for feed, products in sub-accounting areas and waste);\nxiv) means of batch identification;\nxv) anticipated batch flow rate per year;\nxvi) anticipated number of inventory batches present at the measurement or sampling point;\nxvii) anticipated number of items per flow and inventory batches;\nxviii) category, composition and quantity of qualifying nuclear material per batch (including batch data, total weight of each element of qualifying nuclear material and form of qualifying nuclear material);\nxix) features related to containment and surveillance measures;\n36 Overall limit of accuracy: describe procedure to combine individual measurement error determination to obtain the overall limit of accuracy for—\ni) shipper/receiver differences;\nii) book inventory;\niii) physical inventory;\niv) material unaccounted for.\nPost-Operational Information\n37 Decommissioning schedule dates: end of operations, decommissioned;\n38 Facility decommissioning plan including:\ni) key events of the decommissioning plan;\nii) removal and recovery of qualifying nuclear material;\niii) removal or rendering inoperable of essential equipment.\nE. Research and Development Facilities\nGeneral Information\n1 Name of qualifying nuclear facility (including any usual abbreviation);\n2 Location, postal address, telephone number and e-mail address;\n3 Owner (legally responsible person);\n4 Operator (legally responsible person);\n5 Description (main features only);\n6 Purpose;\n7 Status (e.g. planned, under construction, in operation, shutdown, closed down, decommissioned for safeguards purposes);\n8 Construction schedule dates (if not in operation): start of construction, commissioning, operation;\n9 Normal operating mode (days only, number of shifts; number of days/year, etc.);\n10 Facility layout (drawings showing structural containment, fences, access, qualifying nuclear material storage areas, laboratories, waste disposal areas, routes followed by qualifying nuclear material, experimental and test areas, etc.);\n11 Siting of facility (maps showing location, premises and perimeter of site, other buildings, roads, railways, rivers, etc.);\n12 Titles and addresses of persons responsible for accountancy and control of qualifying nuclear material and contact with the Agency (if possible, provide organisation charts showing the position of persons).\nGeneral Facility Data\n13 Facility description (indicating accounting areas), with diagram;\n14 Normal inventory;\n15 Anticipated annual throughput and/or inventory for the facility working at nominal capacity;\n16 Description of the use of qualifying nuclear material;\n17 Important items of equipment which use, produce or process qualifying nuclear material.\nQualifying Nuclear Material Description\n18 Main types of accounting units to be handled in the facility;\n19 Description of qualifying nuclear material for each accounting area (general):\ni) chemical and physical form (with cladding materials description);\nii) enrichment ranges and plutonium content;\niii) estimated nominal weight of qualifying nuclear material at the facility;\n20 Waste material:\ni) source and form (indicating major contributors; liquid or solid; range of constituents, enrichment range and plutonium content; include contaminated equipment);\nii) quantities in storage and at other locations;\niii) method and frequency of recovery/disposal;\n21 Other qualifying nuclear material in the facility and its location (each separately located);\n22 Means of qualifying nuclear material identification in the facility;\n23 Radiation level at qualifying nuclear material locations (at the surface of the qualifying nuclear material and at distance of 1 meter in μSv/h, mSv/h or Sv/h).\nQualifying Nuclear Material Flow\n24 Schematic flowsheet for qualifying nuclear material for operator purposes (identifying measurement points, accounting areas, inventory locations, etc. for operator purposes);\n25 Categories, form and range of quantities of qualifying nuclear material in operation areas, storage areas, other locations (average data for each location).\nHandling of Qualifying Nuclear Material (For Each Accounting Area)\n26 Description of qualifying nuclear material storage (including capacity, anticipated inventory and throughput, etc.), with drawings;\n27 Maximum quantity of qualifying nuclear material to be handled in accounting areas;\n28 Modification of the physical/chemical form during operation;\n29 Qualifying nuclear material transfer;\n30 Frequency of receipt and shipment;\n31 Qualifying nuclear material transfer equipment (if applicable), with drawings;\n32 Description of containers used for storage and handling (with drawings);\n33 Routes followed by qualifying nuclear material;\n34 Shielding (for storage and transfer).\nProtection and Safety Measures\n35 Basic measures for physical protection of qualifying nuclear material;\n36 Specific health and safety rules for inspector compliance.\nAccountancy and Control of Qualifying Nuclear Material\n37 System description: describe the qualifying nuclear material accountancy system, method of recording and reporting accountancy data and establishing material balances and procedures for account adjustment after inventory and correction of mistakes, etc., under the following headings (include specimen forms for all procedures)—\ni) General;\nii) Receipts (including method of dealing with shipper/receiver differences and subsequent account corrections);\niii) Shipments (including waste);\niv) Measured discards (estimated quantities per year/month, method of management);\nv) Retained waste (estimated quantities per year, period of storing);\nvi) Physical inventory: describe procedures, scheduled frequency, estimated distribution on qualifying nuclear material, methods of operator’s inventory taking (both for item and/or mass accountancy, including relevant assay method), accessibility and possible verification method for irradiated qualifying nuclear material, expected accuracy and access to qualifying nuclear material (list major items of equipment regarded as qualifying nuclear material containers);\nvii) Operational Records and Accounting Records (including method of adjustment or correction, place of preservation and language);\n38 Features related to containment and surveillance measures (general description of applied or possible measures);\n39 For each measurement point of accounting areas identified under question 24, provide the following (if applicable)—\nTotal number of measurement points:\ni) description of location, type, identification;\nii) anticipated types of inventory change and/or whether the measurement point can be used for physical inventory taking;\niii) physical and chemical form of qualifying nuclear material (with cladding materials description);\niv) qualifying nuclear material containers, packaging;\nv) sampling procedure and equipment used;\nvi) measurement method and equipment used;\nvii) source and level of random and systematic errors (weight, volume, sampling, analytical, non-destructive assay);\nviii) technique and frequency of calibration of equipment used;\nix) method of converting source data to batch data;\nx) means of batch identification;\nxi) anticipated batch flow rate per year;\nxii) anticipated number of inventory batches;\nxiii) anticipated number of items per flow and inventory batches;\nxiv) category, composition and quantity of qualifying nuclear material per batch (including batch data, total weight of qualifying nuclear material in item, isotopic composition (for uranium) and plutonium content, when appropriate; form of qualifying nuclear material);\nxv) Features related to containment and surveillance measures.\nPost-Operational Information\n40 Decommissioning schedule dates: end of operations, decommissioned;\n41 Facility decommissioning plan including:\ni) key events of the decommissioning plan;\nii) removal and recovery of qualifying nuclear material;\niii) removal or rendering inoperable of essential equipment.\nF. Research and Power Reactors\nGeneral Information\n1 Name of qualifying nuclear facility (including any usual abbreviation);\n2 Location, postal address, telephone number and e-mail address;\n3 Owner (legally responsible person);\n4 Operator (legally responsible person);\n5 Description (main features only);\n6 Purpose;\n7 Status (e.g. planned, under construction, in operation, shutdown, closed down, decommissioned for safeguards purposes);\n8 Construction schedule dates (if not in operation): start of construction, commissioning, operation;\n9 Normal operating mode (days only, number of shifts; number of days/year, etc.);\n10 Facility layout (drawings showing structural containment, fences, access, qualifying nuclear material storage areas, laboratories, waste disposal areas, routes followed by qualifying nuclear material, experimental and test areas, etc.);\n11 Siting of facility (maps showing location, premises and perimeter of site, other buildings, roads, railways, rivers, etc.);\n12 Titles and addresses of persons responsible for accountancy and control of qualifying nuclear material and contact with the Agency (if possible, provide organisation charts showing the position of persons).\nGeneral Reactor Data\n13 Facility description (indicating important items of equipment which use, produce or process qualifying nuclear material) and general flow diagram;\n14 Rated thermal output, electricity output (for power reactors);\n15 Number of units (reactors) and their layout in the facility;\n16 Reactor type;\n17 Type of refuelling (on or off load);\n18 Core enrichment range and plutonium concentration (at equilibrium for on-load reactors; initial and final for off-load reactors);\n19 Moderator;\n20 Coolant;\n21 Blanket, reflector.\nQualifying Nuclear Material Description\n22 Types of fresh fuel;\n23 Fresh fuel enrichment (U-235) and/or plutonium content (average enrichment per each type of assembly);\n24 Nominal weight of fuel in elements/assemblies (with design tolerances);\n25 Physical and chemical form of fresh fuel (general description);\n26 Reactor assemblies (with drawings): indicate for each type—\ni) types of assemblies;\nii) number of fuel assemblies, control and shim assemblies, experimental assemblies in the core, in blanket zone(s);\niii) number and types of fuel elements;\niv) average enrichment and/or plutonium content per assembly;\nv) general structure;\nvi) geometric form;\nvii) dimensions;\nviii) cladding material;\n27 Description of fresh fuel elements (with drawings):\ni) physical and chemical form of fuel;\nii) quantity of qualifying nuclear material and fissionable isotopes (with design tolerance);\niii) enrichment and/or plutonium content;\niv) geometric form;\nv) dimensions;\nvi) number of slugs/pellets per element;\nvii) composition of alloy;\nviii) cladding material (thickness, composition of material, bonding);\n28 Provision for element exchange in assemblies of each type (indicate whether this is foreseen to become a routine operation);\n29 Basic operational accounting unit (fuel elements/assemblies, etc.), with drawings;\n30 Other types of units;\n31 Means of qualifying nuclear material/fuel identification;\n32 Other qualifying nuclear material in the facility (each separately identified).\nQualifying Nuclear Material Flow\n33 Schematic flowsheet for qualifying nuclear material for operator purposes (identifying measurement points, accounting areas, inventory locations, etc.);\n34 Inventory: state quantity range, number of items and approximate uranium enrichment and plutonium content (under normal operating conditions) for the following—\ni) fresh fuel storage;\nii) reactor core;\niii) spent fuel storage;\niv) other locations;\n35 Load factor (power reactor only);\n36 Reactor core loading (number of elements/assemblies);\n37 Refuelling requirements (quantity, time interval);\n38 Burn-up (average/maximum);\n39 Is the irradiated fuel to be reprocessed or stored (if stored, indicate site)?\nHandling of Qualifying Nuclear Material\n40 Fresh fuel:\ni) packaging (description);\nii) layout, general arrangements and storage plan (with drawings);\niii) capacity of store;\niv) fuel preparation and assay room, and reactor loading area (description and indication of layout and general arrangement), with drawings;\n41 Drawings of fuel transfer equipment (including refuelling machines);\n42 Routes followed by qualifying nuclear material (fresh fuel, irradiated fuel, blanket, other qualifying nuclear material);\n43 Reactor vessel diagram (showing core location, access to vessel, vessel openings, fuel handling in vessel);\n44 Reactor core diagram (showing general disposition, lattice, form, pitch, dimensions of core, reflector, blanket; location, shapes and dimensions of fuel elements/assemblies; control elements/assemblies; experimental elements/assemblies);\n45 Number and size of channels for fuel elements or assemblies and for control elements in the core;\n46 Average mean neutron flux in the core:\ni) thermal;\nii) fast;\n47 Instrumentation for measuring neutron and gamma flux;\n48 Irradiated fuel:\ni) layout, spent fuel storage plan and general arrangement (internal and external), with drawings;\nii) method of storage;\niii) design capacity of storage;\niv) minimum and normal cooling period prior to shipment;\nv) description and drawings of irradiated fuel transport equipment and shipping and/or storage cask (if no information on site, specify where it is held);\n49 Maximum radiation dose rate of fuel blanket after refuelling (at the surface and at a distance of 1 metre);\n50 Methods and equipment for handling irradiated fuel (except as already provided under questions 41 and 48(v));\n51 Qualifying nuclear material testing areas: for each such area (except as already provided under question 40) describe—\ni) nature of activities;\nii) major equipment available (e.g. hot cell, fuel element, decladding and dissolution equipment);\niii) shipping containers used (main qualifying nuclear material, scrap and waste);\niv) storage areas for both un-irradiated and irradiated qualifying nuclear material;\nv) layout and general arrangement (with drawings).\nCoolant Data\n52 Flow diagram (indicating mass flow, temperature and pressure at major points, etc.).\nProtection and Safety Measures\n53 Basic measures for physical protection of qualifying nuclear material;\n54 Specific health and safety rules for inspector compliance.\nAccountancy and Control of Qualifying Nuclear Material\n55 System description: describe the qualifying nuclear material accountancy system, method of recording and reporting accountancy data and procedures for account adjustment after inventory change and for correction of mistakes, etc., under the following headings (include specimen forms for all procedures)—\ni) General: state what general and subsidiary ledgers will be used, their form (hard copies, tapes, microfilm, etc.) and who has responsibility and authority; identify the source data (e.g. shipping and receiving forms, the initial recording of measurements and measurement control sheets); describe procedures for making adjustments, the source data and records and how adjustments are authorised and substantiated;\nii) Receipts;\niii) Shipments;\niv) Physical inventory: describe procedures, scheduled frequency, methods of operator’s inventory taking (both for item and/or mass accountancy), including relevant assay methods and expected accuracy, access to qualifying nuclear material, possible verification methods for irradiated qualifying nuclear material, methods of verification of qualifying nuclear material in the core and list major items of equipment regarded as qualifying nuclear material containers;\nv) Nuclear Loss and Production (estimation of limits);\nvi) Operational Records and Accounts (including method of adjustment or correction, place of preservation and language);\n56 Features related to containment and surveillance measures (general description);\n57 For each measurement point of an accounting area (including those identified under questions 13, 33 and 34), provide the following (if applicable) and attach drawings (if necessary)—\nTotal number of measurement points:\ni) description of location, type, identification;\nii) anticipated types of inventory change and whether it is possible to use the measurement point for physical inventory taking\niii) physical and chemical form of qualifying nuclear material (with cladding materials description);\niv) qualifying nuclear material containers, packaging;\nv) sampling procedures and equipment used;\nvi) measurement methods and equipment used (item counting, neutron flux, power level, nuclear burn-up and production, etc.);\nvii) source and level of accuracy;\nviii) technique and frequency of calibration of equipment used;\nix) programme for the continuous appraisal of the accuracy of methods and techniques used;\nx) method of converting source data to batch data (standard calculative procedures, constants used, empirical relationships, etc.);\nxi) anticipated batch flow per year;\nxii) anticipated number of items per flow and inventory batches;\nxiii) category, composition and quantity of qualifying nuclear material per batch (including batch data, total weight of each element of qualifying nuclear material and, in the case of plutonium and uranium, the isotopic composition when appropriate; form of qualifying nuclear material);\nxiv) access to qualifying nuclear material and its location;\nxv) features related to containment and surveillance measures.\nPost-Operational Information\n58 Decommissioning schedule dates: end of operations, decommissioned;\n59 Facility decommissioning plan including:\ni) key events of the decommissioning plan;\nii) removal and recovery of qualifying nuclear material;\niii) removal or rendering inoperable of essential equipment.\nG. Separate Storage Facilities\nGeneral Information\n1 Name of qualifying nuclear facility (including any usual abbreviation);\n2 Location, postal address, telephone number and e-mail address;\n3 Owner (legally responsible person);\n4 Operator (legally responsible person);\n5 Description (main features only);\n6 Purpose;\n7 Status (e.g. planned, under construction, in operation, shutdown, closed down, decommissioned for safeguards purposes);\n8 Construction schedule dates (if not in operation): start of construction, commissioning, operation;\n9 Normal operating mode (days only, number of shifts; number of days/year, etc.);\n10 Facility layout (drawings showing structural containment, fences, access, qualifying nuclear material storage areas, laboratories, waste disposal areas, routes followed by qualifying nuclear material, experimental and test areas, etc.);\n11 Siting of facility (maps showing location, premises and perimeter of site, other buildings, roads, railways, rivers, etc.);\n12 Titles and addresses of persons responsible for accountancy and control of qualifying nuclear material and contact with the Agency (if possible, provide organisation charts showing the position of persons).\nGeneral Storage Data\n13 Facility description (indicating important items of equipment which use, produce or process qualifying nuclear material) and general flow diagram;\n14 Design capacity;\n15 Anticipated annual throughput and inventory (forward programme indicating the proportion of various receipts and shipments).\nQualifying Nuclear Material Description\n16 Main types of accounting units to be handled in the facility;\n17 Description of qualifying nuclear material for each accounting area (general):\ni) physical (mechanical) form and dimensions (for the items stored, with drawings);\nii) chemical and physical form (indicate chemical composition or main alloy constituents);\niii) enrichment range and plutonium content;\niv) range of weight of qualifying nuclear material;\nv) cladding materials;\nvi) means of qualifying nuclear material identification;\nvii) types of containers, packaging;\nviii) radiation level at qualifying nuclear material location;\nix) other qualifying nuclear material in the facility not already specified (quantity, form and location of inventory);\n18 Schematic flowsheet for qualifying nuclear material (identifying measurement points, accounting areas, inventory locations, etc. for operator purposes).\nHandling of Qualifying Nuclear Material (For Each Accounting Area)\n19 Description of qualifying nuclear material storage area (inventory location), with drawings;\n20 Design range of inventories of qualifying nuclear material in each storage area;\n21 Method of positioning of qualifying nuclear material in storage;\n22 Routes and equipment used for movement of qualifying nuclear material (if applicable);\n23 Frequency of receipt and shipment;\n24 Shielding (for storage and transfer).\nProtection and Safety Measures\n25 Basic measures for physical protection of qualifying nuclear material;\n26 Specific health and safety rules for inspector compliance.\nAccountancy and Control of Qualifying Nuclear Material\n27 System description: describe the qualifying nuclear material accountancy system; method of recording and reporting accountancy data and establishing material balances; procedures for account adjustment after inventory change and correction of mistakes, etc., under the following headings (include specimen forms for all procedures)—\ni) General;\nii) Receipts (including method of dealing with shipper/receiver differences and subsequent account corrections);\niii) Shipments (including waste);\niv) Physical inventory: describe procedures, scheduled frequency, estimated distribution of qualifying nuclear material, methods of operator's inventory taking (both for item and/or mass accountancy, including relevant assay method), accessibility and possible verification method for qualifying nuclear material, expected accuracy and access to qualifying nuclear material and list major items of equipment regarded as qualifying nuclear material containers;\nv) Operational Records and Accounting Records (including method of adjustment or correction, place of preservation and language);\n28 Features related to containment and surveillance measures (general description of applied or possible measures);\n29 For each measurement point of accounting areas identified under question 18, provide the following (if applicable)—\nTotal number of measurement points:\ni) description of location, type, identification;\nii) anticipated types of inventory change and/or whether the measurement point can be used for physical inventory taking;\niii) physical and chemical form of qualifying nuclear material (with cladding materials description);\niv) qualifying nuclear material containers, packaging;\nv) sampling procedure and equipment used;\nvi) measurement method and equipment used;\nvii) source and level of random and systematic errors (weight, volume, sampling, analytical, non-destructive assay);\nviii) technique and frequency of calibration of equipment used;\nix) method of converting source data to batch data;\nx) means of batch identification;\nxi) anticipated batch flow rate per year;\nxii) anticipated number of inventory batches;\nxiii) anticipated number of items per flow and inventory batches;\nxiv) category, composition and quantity of qualifying nuclear material per batch (including batch data, total weight of qualifying nuclear material in item, isotopic composition (for uranium) and plutonium content, when appropriate; form of qualifying nuclear material);\nxv) features related to containment and surveillance measures.\nPost-Operational Information\n30 Decommissioning schedule dates: end of operations, decommissioned;\n31 Facility decommissioning plan including:\ni) key events of the decommissioning plan;\nii) removal and recovery of qualifying nuclear material;\niii) removal or rendering inoperable of essential equipment.\nH. Spent Fuel Encapsulation Facilities\nGeneral Information\n1 Name of qualifying nuclear facility (including any usual abbreviation);\n2 Location, postal address, telephone number and e-mail address;\n3 Owner (legally responsible person);\n4 Operator (legally responsible person);\n5 Description (main features only);\n6 Purpose;\n7 Status (e.g. planned, under construction, in operation, shutdown, closed down, decommissioned for safeguards purposes);\n8 Construction schedule dates (if not in operation): start of construction, commissioning, operation;\n9 Normal operating mode (days only, number of shifts; number of days/year, etc.);\n10 Facility layout (drawings showing structural containment, fences, access, qualifying nuclear material storage areas, laboratories, waste disposal areas, routes followed by qualifying nuclear material, experimental and test areas, etc.);\n11 Siting of facility (maps showing location, premises and perimeter of site, other buildings, roads, railways, rivers, etc.);\n12 Titles and addresses of persons responsible for accountancy and control of qualifying nuclear material and contact with the Agency (if possible, provide organisation charts showing the position of persons).\nOverall Process Parameters\n13 Facility description (indicating important items of equipment which use, produce or process qualifying nuclear material, all process stages, storage areas and points as relevant to the measurement, control and accountancy of qualifying nuclear material) and general flow diagram;\n14 Process description and flow sheet;\n15 Design capacity (e.g. number of spent fuel assemblies, other quantities of qualifying nuclear material in metric tonnes);\n16 Anticipated annual throughput (e.g. number of spent fuel assemblies, other quantities of qualifying nuclear material in effective kilograms);\n17 Other important items of equipment processing qualifying nuclear material, if any.\nQualifying Nuclear Material Description and Flow\n18 Description of main qualifying nuclear material:\ni) main categories of qualifying nuclear material and accounting units to be handled in the facility;\nii) physical (mechanical) form, cladding and overall dimensions of spent fuel assemblies (with drawings);\niii) physical (mechanical) form, overall dimensions and capacity of disposal canisters (with drawings);\niv) physical form and overall dimensions of other types of containers and packaging (with drawings);\nv) means of item identification;\nvi) range of initial weights of heavy metal and initial enrichments of uranium in fuel assemblies;\nvii) range of spent fuel burn-ups, cooling times and plutonium contents of fuel assemblies;\nviii) means of batch identification, batch size, flow rate and campaign period;\nix) range of radiation levels in qualifying nuclear material storage and process areas;\nx) range of radiation and heat levels at exterior of transport and disposal containers;\nxi) frequency of receipt and shipment (batches/units per month);\n19 Other qualifying nuclear material in the facility (if any) and its location;\n20 Schematic flowsheet for qualifying nuclear material for operator purposes (identifying flow and inventory measurement points, accounting areas, inventory locations, etc.);\n21 Qualifying nuclear material flow quantities for each qualifying nuclear material handling area i.e. process area (handling cell), storage area (input fuel assemblies; disposal canisters), other locations (including range and maximum quantities of qualifying nuclear material at any one time);\n22 Design range of inventories of qualifying nuclear material in each storage and process area.\nHandling of Qualifying Nuclear Material\n23 Containers and packaging description (with drawings):\ni) Describe containers and packaging in which qualifying nuclear material is received:\n(i) Type;\n(ii) Material;\n(iii) Capacity (in terms of spent fuel assemblies and other qualifying nuclear material);\n(iv) Identification features;\n(v) Size;\nii) Describe containers and packaging in which qualifying nuclear material is shipped (inner container and over pack container):\n(i) Type;\n(ii) Material;\n(iii) Capacity (in terms of spent fuel assemblies and other qualifying nuclear material);\n(iv) Identification features;\n(v) Size;\niii) Range of radiation and heat levels at exterior of storage and transport packages and disposal canisters;\n24 Description of each qualifying nuclear material storage and process area (including range of radiation level in qualifying nuclear material storage and process areas), with drawings;\n25 Shielding (for storage and transfer);\n26 Methods and means of handling and transport of qualifying nuclear material (including loading into disposal containers), with drawings;\n27 Transportation routes followed by qualifying nuclear material (with reference to facility layout), with diagrams.\nFacility Maintenance\n28 Maintenance, decontamination:\ni) normal facility maintenance;\nii) facility and equipment decontamination;\niii) facility start-up and facility shutdown procedures if different from normal operation.\nProtection and Safety Measures\n29 Basic measures for physical protection of qualifying nuclear material;\n30 Specific health and safety rules for inspector compliance.\nAccountancy and Control of Qualifying Nuclear Material\n31 System description: describe the qualifying nuclear material accountancy system, method of recording and reporting accountancy data and establishing material balances, procedures for account adjustment after physical inventory, mistakes, etc., under the following headings (include specimen forms for all procedures)—\ni) General: state what general and subsidiary ledgers will be used, their form (hard copies, tapes, microfilms, etc.) and who has responsibility and authority; identify the source data (e.g. shipping and receiving forms, internal transfer documents, physical inventory forms, initial recording of measurements and measurement control sheets); describe procedures for making adjustments, the source data and records and how adjustments are authorised and substantiated;\nii) Receipts (including method of dealing with account corrections; the checks and measurements used to confirm spent fuel items and the persons responsible for those determinations);\niii) Shipments (disposal canisters, spent fuel assemblies and other qualifying nuclear material, if applicable);\niv) Physical inventory: describe procedures (including basic inventory approach, i.e. planning, organising and conducting the inventory, prelisting, use of prior measurement data, who has primary responsibility for inventory) and methods of operator's inventory taking (for item accountancy), frequency, estimated distribution and accessibility of qualifying nuclear material, verification method and expected accuracy for qualifying nuclear material measurements;\nv) Operational Records and Accounts (including logbooks, general ledgers, internal transfer forms, method of adjustment or correction, retention location, languages, control measures and responsibility for records);\n32 Features related to containment and surveillance measures (general description of applied or possible measures in reference to floor plan or facility layout);\n33 For each flow and inventory measurement point identified under question 20, provide the following—\nTotal number of measurement points:\ni) description of location, type, identification;\nii) types of inventory change at the measurement point;\niii) whether the measurement point can be used for physical inventory taking;\niv) description of qualifying nuclear material (including physical and chemical form; cladding; initial and final heavy metal weight; initial and final uranium isotopic composition; burn-up; cooling time; and plutonium content);\nv) qualifying nuclear material containers, packaging and method of storage;\nvi) item identification and containment and surveillance measures (including special identifying features and radiation and heat characteristics of disposal canisters);\nvii) measurement equipment used and corresponding accuracies (including radiation measurements of fuel assemblies in handling cell);\nviii) measurement control, including technique and frequency of calibration of equipment used, and standards used;\nix) method of converting source data to batch data;\nx) means of batch identification;\nxi) anticipated batch flow rate per year;\nxii) anticipated number of inventory batches;\nxiii) anticipated number of items per flow and inventory batches;\nxiv) category, composition and quantity of qualifying nuclear material per batch (including batch data, total weight of each element of qualifying nuclear material and form of qualifying nuclear material).\nPost-Operational Information\n34 Decommissioning schedule dates: end of operations, decommissioned;\n35 Facility decommissioning plan including:\ni) key events of the decommissioning plan;\nii) removal and recovery of qualifying nuclear material;\niii) removal or rendering inoperable of essential equipment.\nI. Qualifying Nuclear Facilities with Limited Operation\nGeneral Information\n1 Name of qualifying nuclear facility (including any usual abbreviation);\n2 Location, postal address, telephone number and e-mail address;\n3 Owner (legally responsible person);\n4 Operator (legally responsible person);\n5 Description (main features only);\n6 Purpose (intended use of qualifying nuclear material);\n7 Status (e.g. planned, under construction, in operation, shut down, closed down, decommissioned for safeguards purposes);\n8 Facility layout (structural containment, fences, access, qualifying nuclear material storage areas, laboratories, waste disposal areas, routes followed by qualifying nuclear material, experimental and test areas, etc.), with drawings (if applicable);\n9 Siting of facility (maps showing location, premises and perimeter of site, other buildings, roads, railways, rivers, etc.);\nQualifying Nuclear Material Description and Flow\n10 Category of qualifying nuclear material;\n11 General description of qualifying nuclear material: for each category of qualifying nuclear material, describe the typical items and batches (e.g. coupons, rods, samples, trays), including—\ni) chemical and physical form;\nii) enrichment range and plutonium content (if applicable);\niii) amount of qualifying nuclear material usually kept at the facility;\n12 Means of qualifying nuclear material identification;\n13 Radiation level (dose rate) at the surface of the qualifying nuclear material and at distance of 1 meter (in μSv/h, mSv/h or Sv/h);\n14 Description of main containers used for transport, storage and handling, with drawings (if applicable);\n15 Qualifying nuclear material transfer equipment, with drawings (if applicable);\n16 Identification of measurement points, accounting areas, inventory location, with flowsheet.\nProtection and Safety Measures\n17 Basic measures for physical protection of qualifying nuclear material;\n18 Specific health and safety rules for inspector compliance.\nAccountancy and Control of Qualifying Nuclear Material\n19 Description of the system: describe the qualifying nuclear material accountancy system, method of recording and reporting accountancy data and establishing material balance and procedures for account adjustment after inventory change, etc., under the following headings (include specimen forms for all procedures)—\ni) General;\nii) Receipts;\niii) Shipments;\niv) Measured discards and retained waste;\nv) Physical inventory: describe procedures, scheduled frequency, method of operator’s inventory taking, expected accuracy and access to qualifying nuclear material;\nvi) Operational Records and Accounting Records (including method of adjustment or correction, place of preservation and language);\n20 For each measurement point of accounting areas identified under question 16, provide the following (if applicable)—\nTotal number of measurement points:\ni) description of location, type, identification;\nii) physical and chemical form of qualifying nuclear material (with cladding materials description);\niii) measurement method and equipment used;\niv) method of converting source data to batch data;\nv) means of batch identification and batch data description.\nPost-Operational Information\n21 Decommissioning schedule dates: end of operations, decommissioned;\n22 Facility decommissioning plan including:\ni) key events of the decommissioning plan;\nii) removal of qualifying nuclear material;\niii) removal or rendering inoperable of essential equipment.”",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ukdsi/2026/9780348282702/schedule",
    "retrieved_at": "2026-10-30T14:37:31.285181+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}