Regulation 19 Pipeline deposit information

Original text. Later amendments are not shown.

(1)

Where the OGA grants consent to a pipeline deposit proposal, this regulation applies to the following information relating to a deposit in respect of which that consent was granted—

(a)

the number assigned to the pipeline to which the deposit relates;

(b)

the dates on which the process of placing the deposit on the seabed started and finished or is expected to start and finish;

(c)

the type, size and quantity of the material which is used or expected to be used;

(d)

the geographic coordinates of the location of the deposit on the seabed.

(2)

Where this regulation applies, the OGA (or a subsequent holder) may publish the information after the date on which the OGA grants consent to the pipeline deposit proposal.

(3)

In this regulation—

  • “deposit” means any material placed on the seabed for the protection or support of a pipeline;

  • “pipeline deposit proposal” means a proposal submitted pursuant to a pipeline works authorisation to place a deposit on the seabed—

    1. (a)

      during the construction of the pipeline, or

    2. (b)

      for the maintenance of the pipeline.