# The Oil and Gas Authority (Offshore Petroleum) (Disclosure of Protected Material after Specified Period) Regulations 2018, Regulation 5: Summary information relating to geological surveys carried out by or on behalf of an offshore licensee


(1) This regulation applies to the following information relating to a geological survey which is carried out by or on behalf of an offshore licensee—
(a) the name of the survey;
(b) the dates on which the survey started and finished or was expected to start and finish;
(c) the type of survey;
(d) whether the survey was carried out by or on behalf of the holder of a production licence for the purpose of getting petroleum under that licence;
(e) the geographic coordinates of the area surveyed;
(f) for seismic surveys—
(i) the device used to generate the energy used in the survey;
(ii) the depth below sea level at which the device was located;
(iii) the intervals between activating the device during the survey;
(iv) the intervals between measurements taken during the survey;
(v) the duration of the recording of the seismic trace;
(vi) the length of the streamer cables towed by a seismic vessel;
(vii) where there were multiple streamer cables towed by a seismic vessel, the lateral separation between them.
(2) Where this regulation applies, the OGA (or a subsequent holder) may publish the information after the date on which the geological survey finishes.

---
Source: https://www.legislation.gov.uk/ukdsi/2018/9780111170342/regulation/5 (the official version)
Page: https://openlegislation.uk/draft-oil-and-gas-authority-offshore-petroleum-disclosure-of-protected-material-after-specified-period-regulations-2018/regulation-5
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.