PART A PART A
- (a)
Tanning hides and skins where the treatment capacity exceeds 12 tonnes of finished products per day.
- (b)
Disposing of or recycling animal carcasses and animal waste at installations with a capacity exceeding 10 tonnes per day and other than by incineration or co-incineration at installations falling within Section 5.1 of this Schedule.
- (c)
Slaughtering animals in slaughterhouses with a carcass production capacity of more than 50 tonnes per day.
- (d)
Treatment and processing, other than exclusively packaging, of the following raw materials, whether previously processed or unprocessed, intended for the production of food or feed from—
- (i)
only animal raw materials (other than milk only) with a finished product production capacity of more than 75 tonnes per day,
- (ii)
only vegetable raw materials with a finished product production capacity of more than—
- (aa)
300 tonnes per day, or
- (bb)
600 tonnes per day where the installation operates for a period of no more than 90 consecutive days in any year;
- (aa)
- (iii)
animal and vegetable raw materials (other than milk only), both in combined and separate products, with a finished product production capacity in tonnes per day greater than—
- (aa)
75 if A is equal to 10 or more, or
- (bb)
300 – (22.5 x A) in any other case
where ‘A’ is the portion of animal material in percent of weight of the finished product production capacity.
- (aa)
- (i)
- (e)
Treating and processing milk, the quantity of milk received being more than 200 tonnes per day (average value on an annual basis).