{
  "url": "https://openlegislation.uk/draft-railways-interoperability-in-northern-ireland-convention-on-international-carriage-by-rail-amendment-regulations-2026/regulation-9",
  "json_url": "https://openlegislation.uk/draft-railways-interoperability-in-northern-ireland-convention-on-international-carriage-by-rail-amendment-regulations-2026/regulation-9.json",
  "legislation": "ukdsi/2026/9780348284874",
  "legislation_title": "The Railways (Interoperability in Northern Ireland) (Convention on International Carriage by Rail) (Amendment) Regulations 2026",
  "legislation_url": "https://openlegislation.uk/draft-railways-interoperability-in-northern-ireland-convention-on-international-carriage-by-rail-amendment-regulations-2026",
  "path": "regulation/9",
  "kind": "regulation",
  "number": "9",
  "heading": "Authorisation decision for fixed installations",
  "text": "(1) The DFI must determine an application for an authorisation to place a fixed installation in service by—\n(a) issuing an authorisation for the placing in service of the fixed installation, or\n(b) refusing the application for authorisation.\n(2) The DFI must issue an authorisation for placing in service of the fixed installation or a negative decision within a reasonable time period communicated to the applicant in advance, and in any event, within the period of four months beginning with the day after the day on which the DFI receives the application or, where the DFI has specified in accordance with regulation 6(5)(b) that supplementary information is required, within the period of four months beginning with the day after the day that information is received.\n(3) Where the DFI refuses an application under paragraph (1)(b), the applicant may, within the period of one month beginning with the day after the day on which the applicant receives notification of that decision, request the DFI to review its decision.\n(4) On receipt of a request for review of a decision in accordance with paragraph (3), the DFI must confirm or reverse that decision within two months beginning with the day after the day of receipt of the request for review.\n(5) The DFI must only issue an authorisation for the placing in service of a fixed installation—\n(a) where it is satisfied that an EC declaration of verification has been drawn up,\n(b) where it has received the evidence referred to in regulation 6(1)(a) and (b),\n(c) where it is satisfied that the project subsystem has been so designed, constructed and installed as to meet the essential requirements relating to that subsystem when placed in service,\n(d) in the case of trackside control-command and signalling subsystems involving ERTMS equipment—\n(i) where it is satisfied that an approval decision of the European Union Agency for Railways issued in accordance with regulation 7 has been complied with, and\n(ii) where the change described in regulation 6(1)(e)(ii) has occurred, it is satisfied that there has been compliance with the result of the procedure referred to in Article 30 (2) of the Agency Regulation, and\n(e) where the applicant has satisfactorily completed any checks required by the DFI under regulation 6(3).",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ukdsi/2026/9780348284874/regulation/9",
    "retrieved_at": "2026-10-30T14:37:07.301755+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}