OpenLegislation

Regulation 3 Amendments to regulation 2 (interpretation)

Original text. Later amendments are not shown.

In regulation 2 insert the following definitions in the appropriate places—

  • ““environmental permit” means a permit issued in accordance with the provisions of the Environmental Permitting (England and Wales) Regulations 2010f1 or the Pollution Prevention and Control (Scotland) Regulations 2012f2;”

  • ““heat loss calculation” means a calculation of heat lost which is carried out in accordance with the guidance issued by the Chartered Institute of Building Services Engineers and contained in CIBSE Guide C- reference data (2007 edition)f3;”

  • ““net heat input” means the means the rate of heat (expressed as the amount of heat over time) which is supplied to the plant by the fuel used, based on the net calorific value of that fuel;”

  • ““NOx” means oxides of nitrogen;”

  • ““PM” means particulate matter;”

  • ““properly insulated” means insulated so that the relevant maximum permissible heat losses set in BS 5422: 2009f4 are not exceeded, where—

    1. (a)

      heat losses are calculated in accordance with the equations listed in and following the principles described in BS EN ISO 12241:2008f5, and

    2. (b)

      pursuant to that standard such calculations include, in respect of underground piping, the insulating effect of the soil in which the pipe is buried;”

  • ““RHI emission certificate” means a document which meets the requirements in regulation 5A;”

  • ““second relevant date” means the date of coming into force of the Renewable Heat Incentive Scheme (Amendment) (No. 2) Regulations 2013;”

  • ““testing laboratory” means an organisation which carries out the testing of emissions from a plant either at permanent laboratory premises or away from those premises;”

  • ““type-testing range” means a range of plants which have the same construction and design so that the testing of one or more plants in that range gives results capable of applying to all plants in the range, provided that—

    1. (a)

      where the installation capacity of the smallest of the plants in the range is less than or equal to 500 kWth, the ratio of the installation capacity of the smallest plant to that of the largest plant in the type-testing range for which tests are carried out is no more than 1: 2, or

    2. (b)

      where the installation capacity of the smallest of the plants is greater than 500 kWth, then the difference in installation capacity between the smallest and largest of the plants within the type-testing range for which tests are carried out is no more than 500 kWth.”.

Annotations

Footnotes

f1

S.I. 2010/675 amended by S.I. 2010/2933, 2011/881, 988 and 2043 and S.I. 2012/630 in England and S.I. 2011/2377 in Wales.

f2

S.S.I 2012/360.

f3

ISBN 978 1 903287 80 4. Copies can be obtained from the British Standards Institution at www.bsigroup.com.

f4

ISBN 978 0 580 69184 3. Copies can be obtained from the British Standards Institution at www.bsigroup.com.

f5

ISBN 978 0 580 56728 5. Copies can be obtained from the British Standards Institution at www.bsigroup.com.