# The Renewable Heat Incentive Scheme Regulations 2017, Regulation 44: Ongoing obligations: emissions from biomass


Participants generating heat from solid biomass in an accredited RHI installation in respect of which an RHI emission certificate is required must—
(a) use fuel of a type specified in the RHI emission certificate;
(b) use fuel with a moisture content which is no greater than the maximum moisture content specified in the RHI emission certificate; and
(c) operate the accredited RHI installation in accordance with the manufacturer’s instructions for that plant in relation to the control of emissions of PM and NOx.

---
Source: https://www.legislation.gov.uk/ukdsi/2017/9780111156476/regulation/44 (the official version)
Page: https://openlegislation.uk/draft-renewable-heat-incentive-scheme-regulations-2017/regulation-44
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

