Article 25 Substitution of Part 2 of Schedule 2 (amount of electricity to be stated in ROCs generally)
For Part 2 of Schedule 2 to the 2009 Order substitute—
“PART 2
AMOUNT OF ELECTRICITY TO BE STATED IN ROCs ISSUED FOR ELECTRICITY GENERATED USING PRE-2013 CAPACITY
Articles 27(4) and (9) and 33(3)
Generation type
Amount of electricity (in megawatt hours) to be stated in a ROC issued for electricity generated using pre-2013 capacity
AD Advanced gasification/pyrolysis Co-firing of regular bioliquid Dedicated biomass Dedicated energy crops Electricity generated from landfill gas Electricity generated from sewage gas Energy from waste with CHP Geopressure Geothermal High-range co-firing Hydroelectric Low-range co-firing Mid-range co-firing Offshore wind Onshore wind Solar photovoltaic Standard gasification/pyrolysis Station conversion Tidal impoundment – tidal barrage Tidal impoundment – tidal lagoon Tidal stream Unit conversion Wave ”