OpenLegislation

Article 25 Substitution of Part 2 of Schedule 2 (amount of electricity to be stated in ROCs generally)

Original text. Later amendments are not shown.

For Part 2 of Schedule 2 to the 2009 Order substitute—

“PART 2

AMOUNT OF ELECTRICITY TO BE STATED IN ROCs ISSUED FOR ELECTRICITY GENERATED USING PRE-2013 CAPACITY

Articles 27(4) and (9) and 33(3)

Generation type

Amount of electricity (in megawatt hours) to be stated in a ROC issued for electricity generated using pre-2013 capacity

AD 1 2
Advanced gasification/pyrolysis 1 2
Co-firing of regular bioliquid 2
Dedicated biomass 2 3
Dedicated energy crops 1 2
Electricity generated from landfill gas 4
Electricity generated from sewage gas 2
Energy from waste with CHP 1
Geopressure 1
Geothermal 1 2
High-range co-firing 10 9
Hydroelectric 1
Low-range co-firing 2
Mid-range co-firing 5 3
Offshore wind 1 2
Onshore wind 1
Solar photovoltaic 1 2
Standard gasification/pyrolysis 1
Station conversion 1
Tidal impoundment – tidal barrage 1 2
Tidal impoundment – tidal lagoon 1 2
Tidal stream 1 2
Unit conversion 1
Wave 1 2

”