Article 7 Amendments to article 24 of the 2009 Order (ROCs to be issued by Authority in respect of a generating station’s renewable output)
Article 24 of the 2009 Orderf1 is amended as follows.
In the heading, before “renewable output” insert “RO eligible”.
In paragraph (2)(a), before “renewable output” insert “RO eligible”.
In paragraph (3)—
in sub-paragraph (a)—
before “renewable output” insert “RO eligible”; and
at the end insert “and”;
omit sub-paragraphs (aa) and (b); and
in sub-paragraph (c), for “remaining” substitute “RO eligible”.
For paragraph (4)(b) substitute—
“(b)wholly from renewable sources and the RO input electricity used by the generating station in generating that electricity exceeds 0.5% of the RO output electricity,
(ba)partly using excluded capacity,
(bb)partly from an ineligible renewable source, or”.
In paragraph (5), before “renewable output” insert “RO eligible”.
Omit paragraph (6).
Annotations
Footnotes
- f1
-
Article 24 was amended by article 6 of S.I. 2013/768.