Article 32 Substitution of Part 2 of Schedule 2 (amount of electricity to be stated in NIROCs generally)
For Part 2 of Schedule 2 to the 2009 Order substitute—
“PART 2
AMOUNT OF ELECTRICITY TO BE STATED IN NIROCs ISSUED FOR ELECTRICITY GENERATED USING PRE-2013 CAPACITY
Articles 25(4) and (9) and 31(3)
Generation type
Amount of electricity (in megawatt hours) to be stated in a NIROC issued for electricity generated using pre-2013 capacity
AD Advanced gasification/pyrolysis Co-firing of regular bioliquid 2 Dedicated biomass Dedicated energy crops Electricity generated from landfill gas 1 Electricity generated from sewage gas 2 Energy from waste with CHP 1 Geopressure 1 Geothermal High-range co-firing Hydroelectric 1 Low-range co-firing 2 Mid-range co-firing Offshore wind Onshore wind 1 Solar photovoltaic Standard gasification/pyrolysis 1 Station conversion 1 Tidal impoundment – tidal barrage Tidal impoundment – tidal lagoon Tidal stream Unit conversion 1 Wave ”