  "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026",
  "json_url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026.json",
  "id": "ukdsi/2026/9780348286762",
  "title": "The Renewables Obligation and Electricity Capacity (Amendment) (British Industrial Competitiveness Scheme Excluded Electricity) Regulations 2026",
  "short_title": "Renewables Obligation and Electricity Capacity (British Industrial Competitiveness Scheme Excluded Electricity) 2026",
  "long_title": "These Regulations are made in exercise of the powers in sections 32, 32A, 32J and 32K of the Electricity Act 1989 (c. 29) and sections 27, 28, 30, 32, 33 and 40 of the Energy Act 2013 (c. 32). They make provision about BICS excluded electricity, which is a proportion of electricity measured by meters in respect of a manufacturing site which is used to carry out certain manufacturing activities (defined as “specified activity” in these Regulations). BICS excluded electricity is then excluded from the calculations of a supplier’s liability under the Renewables Obligation Order 2015 (S.I. 2015/1947), the Electricity Capacity (Supplier Payment etc.) Regulations 2014 (S.I. 2014/3354) and the Electricity Capacity (Supplier Payment etc.) (Amendment and Excluded Electricity) Regulations 2024 (S.I. 2024/434).",
  "citation": "Draft 2026, ISBN 9780348286762",
  "type": "ukdsi",
  "year": "2026",
  "number": "9780348286762",
  "version": "current",
  "date": null,
  "revised": false,
  "valid_from": null,
  "extent": null,
  "unapplied_effects": 0,
  "provisions": [
    {
      "path": "introduction",
      "kind": "introduction",
      "number": null,
      "heading": "Introductory text",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/introduction",
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "part/1",
      "kind": "part",
      "number": "1",
      "heading": "Introduction",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/1",
      "kind": "regulation",
      "number": "1",
      "heading": "Citation and commencement",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-1",
      "extent": null,
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "regulation/2",
      "kind": "regulation",
      "number": "2",
      "heading": "Extent",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-2",
      "extent": null,
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "regulation/3",
      "kind": "regulation",
      "number": "3",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-3",
      "extent": null,
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "regulation/4",
      "kind": "regulation",
      "number": "4",
      "heading": "Meaning of “specified activity”",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-4",
      "extent": null,
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "part/2",
      "kind": "part",
      "number": "2",
      "heading": "BICS Excluded Electricity",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/5",
      "kind": "regulation",
      "number": "5",
      "heading": "BICS excluded electricity",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-5",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "regulation/6",
      "kind": "regulation",
      "number": "6",
      "heading": "BICS determinations",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-6",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "regulation/7",
      "kind": "regulation",
      "number": "7",
      "heading": "Applications for BICS determinations",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-7",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "regulation/8",
      "kind": "regulation",
      "number": "8",
      "heading": "BICS determinations: relevant proportion of electricity",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-8",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "regulation/9",
      "kind": "regulation",
      "number": "9",
      "heading": "Notification of change in circumstance",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-9",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "regulation/10",
      "kind": "regulation",
      "number": "10",
      "heading": "Annual declaration",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-10",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "regulation/11",
      "kind": "regulation",
      "number": "11",
      "heading": "Year 2 review report",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-11",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "regulation/12",
      "kind": "regulation",
      "number": "12",
      "heading": "Validity, revocation and correction of BICS determinations",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-12",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "regulation/13",
      "kind": "regulation",
      "number": "13",
      "heading": "Information sharing",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-13",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "part/3",
      "kind": "part",
      "number": "3",
      "heading": "Amendment of the Supplier Payment Regulations",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/14",
      "kind": "regulation",
      "number": "14",
      "heading": "Amendment of the Supplier Payment Regulations",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-14",
      "extent": null,
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/15",
      "kind": "regulation",
      "number": "15",
      "heading": "Amendment of regulation 2 (interpretation)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-15",
      "extent": null,
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/16",
      "kind": "regulation",
      "number": "16",
      "heading": "Amendment of regulation 4 (forecast of relevant demand and CM EII excluded electricity)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-16",
      "extent": null,
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/17",
      "kind": "regulation",
      "number": "17",
      "heading": "Amendment of regulation 6 (capacity market supplier charge)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-17",
      "extent": null,
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/18",
      "kind": "regulation",
      "number": "18",
      "heading": "Amendment of regulation 19 (recalculation of payments: general)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-18",
      "extent": null,
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "regulation/19",
      "kind": "regulation",
      "number": "19",
      "heading": "Amendment of Schedule 1 (calculation of amounts)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-19",
      "extent": null,
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "part/4",
      "kind": "part",
      "number": "4",
      "heading": "Amendment of the Electricity Supplier Obligations (Amendment & Excluded Electricity) Regulations 2015",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/20",
      "kind": "regulation",
      "number": "20",
      "heading": "Amendment of the Electricity Supplier Obligations (Amendment & Excluded Electricity) Regulations 2015",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-20",
      "extent": null,
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "regulation/21",
      "kind": "regulation",
      "number": "21",
      "heading": "Amendment of regulation 2 (interpretation)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-21",
      "extent": null,
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "regulation/22",
      "kind": "regulation",
      "number": "22",
      "heading": "Amendment of regulation 8 (EII certificates)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-22",
      "extent": null,
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "regulation/23",
      "kind": "regulation",
      "number": "23",
      "heading": "Amendment of regulation 10 (applications for EII certificates)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-23",
      "extent": null,
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "part/5",
      "kind": "part",
      "number": "5",
      "heading": "Amendment of the Renewables Obligation Order 2015",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/24",
      "kind": "regulation",
      "number": "24",
      "heading": "Amendment of the Renewables Obligation Order 2015",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-24",
      "extent": null,
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/25",
      "kind": "regulation",
      "number": "25",
      "heading": "Amendment of article 2 (interpretation)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-25",
      "extent": null,
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/26",
      "kind": "regulation",
      "number": "26",
      "heading": "Amendment of article 7 (the renewables obligation)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-26",
      "extent": null,
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/27",
      "kind": "regulation",
      "number": "27",
      "heading": "Amendment of article 13A (determining the number of UK ROCs: obligation periods beginning on or after 1st April 2019)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-27",
      "extent": null,
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/28",
      "kind": "regulation",
      "number": "28",
      "heading": "New articles 13D and 13E (EII excluded electricity and BICS excluded electricity)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-28",
      "extent": null,
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "regulation/29",
      "kind": "regulation",
      "number": "29",
      "heading": "Amendment of article 79 (provision of information)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-29",
      "extent": null,
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "part/6",
      "kind": "part",
      "number": "6",
      "heading": "Amendment of the Supplier Payment (Amendment and Excluded Electricity) Regulations",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "regulation/30",
      "kind": "regulation",
      "number": "30",
      "heading": "Amendment of the Supplier Payment (Amendment and Excluded Electricity) Regulations",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-30",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "regulation/31",
      "kind": "regulation",
      "number": "31",
      "heading": "Amendment of regulation 2 (interpretation)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-31",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "regulation/32",
      "kind": "regulation",
      "number": "32",
      "heading": "Amendment of Part 2 (CM EII excluded electricity)",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-32",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "signature",
      "kind": "signature",
      "number": null,
      "heading": "Signature",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/signature",
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "note",
      "kind": "note",
      "number": null,
      "heading": "Explanatory note",
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/note",
      "extent": null,
      "status": null,
      "parent": null
    }
  ],
  "has_text": true,
  "pdfs": [
    {
      "title": "Printed copy",
      "main": true,
      "language": null,
      "date": "2026-09-09",
      "size": 672171,
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/pdf/ukdsi_9780348286762_en.pdf",
      "source_url": "https://www.legislation.gov.uk/ukdsi/2026/9780348286762/pdfs/ukdsi_9780348286762_en.pdf"
    },
    {
      "title": "UK Draft Explanatory Memorandum",
      "main": false,
      "language": null,
      "date": "2026-09-09",
      "size": 515583,
      "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/pdf/ukdsiem_9780348286762_en_001.pdf",
      "source_url": "https://www.legislation.gov.uk/ukdsi/2026/9780348286762/pdfs/ukdsiem_9780348286762_en_001.pdf"
    }
  ],
  "outstanding_effects": [],
  "made_under": [
    {
      "id": "ukpga/1989/29",
      "title": "Electricity Act 1989",
      "url": "https://openlegislation.uk/electricity-act-1989",
      "provisions": [
        "section/32",
        "section/32A",
        "section/32J",
        "section/32K",
        "section/60",
        "contents",
        "section/32L",
        "section/6"
      ]
    },
    {
      "id": "ukpga/2013/32",
      "title": "Energy Act 2013",
      "url": "https://openlegislation.uk/energy-act-2013",
      "provisions": [
        "section/27",
        "section/28",
        "section/30",
        "section/32",
        "section/33",
        "section/40",
        "contents",
        "section/5"
      ]
    }
  ],
  "changes_made_to": 0,
  "changes_made_to_url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/changes.json",
  "changes_made_by": 0,
  "changes_made_by_url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/changes/by-it.json",
  "instruments_made_under": 0,
  "instruments_made_under_url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/instruments.json",
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ukdsi/2026/9780348286762",
    "retrieved_at": "2026-10-30T14:36:55.446529+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}