{
  "url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-9",
  "json_url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026/regulation-9.json",
  "legislation": "ukdsi/2026/9780348286762",
  "legislation_title": "The Renewables Obligation and Electricity Capacity (Amendment) (British Industrial Competitiveness Scheme Excluded Electricity) Regulations 2026",
  "legislation_url": "https://openlegislation.uk/draft-renewables-obligation-and-electricity-capacity-amendment-british-industrial-competitiveness-scheme-excluded-electricity-regulations-2026",
  "path": "regulation/9",
  "kind": "regulation",
  "number": "9",
  "heading": "Notification of change in circumstance",
  "text": "Where any of the following occur (“change in circumstance”), the BICS applicant must, as soon as reasonably practicable, notify the Secretary of State in writing of the change in circumstance and provide updated or additional information in relation to it—\n(a) there is a change to any of the following—\n(i) the name, address or email address of the individual referred to in regulation 7(1)(a);\n(ii) the name or address, including the email address, of the BICS applicant;\n(iii) whether the firm carries out activities in Northern Ireland;\n(iv) the structure or organisation of the firm carrying out the activity to which the BICS determination relates, including a change of ownership or control of the firm or a transfer of the firm’s business, including the transfer of a significant portion of its assets or liabilities to another person;\n(v) the electricity supplier who supplies electricity measured by the meters in respect of a manufacturing site to which the BICS determination relates;\n(vi) any arrangements pursuant to which the BICS applicant obtains electricity from a third party other than an electricity supplier;\n(vii) the manufacturing site to which the BICS determination relates, including—\n(aa) a change of address,\n(bb) the cessation or substantial modification of the activity on the site to which the determination relates,\n(cc) a full or partial closure of the site, whether temporary or permanent, and\n(dd) a change to the arrangements pursuant to which the manufacturing site is shared;\n(viii) the metering arrangements at the manufacturing site to which the BICS determination relates, including—\n(aa) the removal of a meter in respect of the manufacturing site, and\n(bb) a change to the sharing of electricity supplied to the meters in respect of the manufacturing site which would result in a change to the proportion of electricity constituting BICS excluded electricity calculated under regulation 8;\n(b) there is a reduction in the amount, level, intensity or frequency of any specified activity which is or was being carried out using electricity measured by the meters in respect of the manufacturing site to which the BICS determination relates, as a result of which the proportion of electricity measured by the meters to which the BICS determination relates which constitutes BICS excluded electricity is likely to be lower;\n(c) there is an increase in the amount, level, intensity or frequency of a non-specified activity which is or was being carried out using electricity measured by the meters in respect of the manufacturing site to which the BICS determination relates, as a result of which the proportion of electricity measured by the meters to which the BICS determination relates which constitutes BICS excluded electricity is likely to be lower;\n(d) the BICS applicant becomes aware of an error in relation to its BICS determination, in that the proportion of electricity measured by the meters in respect of the manufacturing site that constitutes BICS excluded electricity is incorrect;\n(e) the BICS applicant becomes aware of an error in—\n(i) a BICS application,\n(ii) a notification under this regulation,\n(iii) an annual declaration sent to the Secretary of State under regulation 10, or\n(iv) a year 2 review report sent to the Secretary of State under regulation 11;\n(f) the BICS applicant is issued with an EII certificate in respect of a meter to which the BICS determination relates;\n(g) the BICS applicant becomes insolvent or enters into an insolvency procedure of any description.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ukdsi/2026/9780348286762/regulation/9",
    "retrieved_at": "2026-10-30T14:36:55.446529+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}