Article 11 Circumstances relating to certain offshore wind, gasification or pyrolysis generating stations notified to the Authority on or before the relevant date

Original text. Later amendments are not shown.

The circumstances set out in this article are where the electricity is generated—

(a)

using the original capacity of a generating station—

(i)

which was accredited on or before 31st March 2018, and

(ii)

in respect of which a notice of intent (within the meaning of article 13) was received by the Authority on or before the relevant date, and

(b)

in the way described in Part 1 of Schedule 2 to the Renewables Obligation Order 2009 as—

(i)

advanced gasification/pyrolysis,

(ii)

offshore wind, or

(iii)

standard gasification/pyrolysis.