OpenLegislation

Article 2 Interpretation

Original text. Later amendments are not shown.

(1)

In this Order—

  • “accredited” is to be construed in accordance with the definition of “accreditation” in article 2 of the Renewables Obligation Order 2009f1;

  • “CHPQA 3” means the Combined Heat and Power Quality Assurance Standard, Issue 3, published by the Department for Environment, Food and Rural Affairs in January 2009f2;

  • “CHPQA 5” means the Combined Heat and Power Quality Assurance Standard, Issue 5, published by the Department of Energy and Climate Change in November 2013f3;

  • “commission” and “commissioned” are to be construed in accordance with the definition of “commissioned” in article 2 of the Renewables Obligation Order 2009;

  • “grid works”, in relation to a generating station, means—

    1. (a)

      the construction of a connection between the station and a transmission or distribution system for the purpose of enabling electricity to be conveyed from the station to that system, or

    2. (b)

      the carrying out of modifications to a connection between the station and a transmission or distribution system for the purpose of enabling an increase in the amount of electricity that can be conveyed over that connection from the station to that system;

  • “network operator” means a distribution exemption holder, distribution licence holder or a transmission licence holder;

  • “original capacity”, in relation to a generating station, means the generating capacity of the station as accredited;

  • “radar works” means—

    1. (a)

      the construction of a radar station,

    2. (b)

      the installation of radar equipment,

    3. (c)

      the carrying out of modifications to a radar station or to radar equipment, or

    4. (d)

      the testing of a radar station or radar equipment;

  • “relevant date” means the later of—

    1. (a)

      31st October 2014, and

    2. (b)

      the date falling two months after the day on which this Order comes into force; and

  • “relevant fossil fuel generating station” has the same meaning as in Schedule 2 to the Renewables Obligation Order 2009f4.

(2)

In this Order, the following have the same meaning as in the Renewables Obligation Order 2009f5—

  • “biomass”;

  • “energy crops”;

  • “permitted ancillary purposes”;

  • “regular biomass”;

  • “waste”.

Annotations

Footnotes

f1

S.I. 2009/785 as amended by S.I. 2010/1107, S.I. 2011/984, paragraph 29 of Schedule 4 to S.I. 2011/988, S.I. 2013/768 and S.I. 2014/893. Article 2 of S.I. 2009/785 has been amended by article 2 of S.I. 2013/768. There are other amendments to article 2 which are not relevant.

f2

Copies can be obtained from the Department of Energy and Climate Change, 3 Whitehall Place, London, SW1A 2AW and are available at http://chpqa.decc.gov.uk/chpqa-documents.

f3

Copies can be obtained from the Department of Energy and Climate Change, 3 Whitehall Place, London, SW1A 2AW and are available at http://chpqa.decc.gov.uk/chpqa-documents.

f4

Schedule 2 to S.I. 2009/785 has been amended by article 17 of S.I. 2011/984 and article 24 of S.I. 2013/768. There are other amendments which are not relevant.

f5

See article 2(1) of S.I. 2009/785 (as amended by article 2 of S.I. 2013/768).