  "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015",
  "json_url": "https://openlegislation.uk/draft-renewables-obligation-order-2015.json",
  "id": "ukdsi/2015/9780111138359",
  "title": "The Renewables Obligation Order 2015",
  "short_title": "Renewables Obligation 2015",
  "long_title": "This Order consolidates and re-enacts the Renewables Obligation Order 2009 (S.I. 2009/785) (the “2009 Order”) as amended and makes new provision. It imposes an obligation (“the renewables obligation”), on all electricity suppliers licensed under the Electricity Act 1989 (“the Act”) which supply electricity in England and Wales, to produce a certain number of renewables obligation certificates in respect of each megawatt hour of electricity that each supplies to customers in England and Wales during a specified period known as an “obligation period” (article 7). It also “bands” the different technologies that are used to generate electricity from renewable sources, meaning that the number of certificates that will be issued in respect of that electricity depends on the way in which that electricity has been generated. The renewables obligation is administered by the Gas and Electricity Markets Authority (“the Authority”) who issues renewable obligation certificates to renewable electricity generators based on their renewable output. These certificates are sold to electricity suppliers with or without the associated renewable electricity.",
  "citation": "Draft 2015, ISBN 9780111138359",
  "type": "ukdsi",
  "year": "2015",
  "number": "9780111138359",
  "version": "current",
  "date": null,
  "revised": false,
  "valid_from": null,
  "extent": null,
  "unapplied_effects": 0,
  "provisions": [
    {
      "path": "introduction",
      "kind": "introduction",
      "number": null,
      "heading": "Introductory text",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/introduction",
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "part/1",
      "kind": "part",
      "number": "1",
      "heading": "Introductory provisions",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "article/1",
      "kind": "article",
      "number": "1",
      "heading": "Citation, commencement and extent",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-1",
      "extent": null,
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "article/2",
      "kind": "article",
      "number": "2",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-2",
      "extent": null,
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "article/3",
      "kind": "article",
      "number": "3",
      "heading": "Biomass and fuels which are to be treated as biomass",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-3",
      "extent": null,
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "article/4",
      "kind": "article",
      "number": "4",
      "heading": "Fossil derived bioliquid",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-4",
      "extent": null,
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "article/5",
      "kind": "article",
      "number": "5",
      "heading": "Waste as a renewable source",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-5",
      "extent": null,
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "article/6",
      "kind": "article",
      "number": "6",
      "heading": "Grace period generating stations",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-6",
      "extent": null,
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "part/2",
      "kind": "part",
      "number": "2",
      "heading": "The renewables obligation",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "article/7",
      "kind": "article",
      "number": "7",
      "heading": "The renewables obligation",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-7",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/8",
      "kind": "article",
      "number": "8",
      "heading": "Part of calculation A referable to Great Britain",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-8",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/9",
      "kind": "article",
      "number": "9",
      "heading": "Part of calculation A referable to Northern Ireland",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-9",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/10",
      "kind": "article",
      "number": "10",
      "heading": "Calculation A",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-10",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/11",
      "kind": "article",
      "number": "11",
      "heading": "Calculation B",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-11",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/12",
      "kind": "article",
      "number": "12",
      "heading": "Determining the total number of UK ROCs to be produced in an obligation period",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-12",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/13",
      "kind": "article",
      "number": "13",
      "heading": "Determining the number of UK ROCs to be produced by a designated electricity supplier in order to discharge its renewables obligation",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-13",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/14",
      "kind": "article",
      "number": "14",
      "heading": "Further provision in relation to the production of UK ROCs",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-14",
      "extent": null,
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "part/3",
      "kind": "part",
      "number": "3",
      "heading": "Matters to be certified by and content of ROCs",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "article/15",
      "kind": "article",
      "number": "15",
      "heading": "Matters to be certified by ROCs",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-15",
      "extent": null,
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/16",
      "kind": "article",
      "number": "16",
      "heading": "When electricity is to be regarded as supplied to customers in Great Britain or Northern Ireland",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-16",
      "extent": null,
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/17",
      "kind": "article",
      "number": "17",
      "heading": "When electricity is used in a permitted way for ROCs certifying matters within section 32B(7) or (8) of the Act",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-17",
      "extent": null,
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "part/4",
      "kind": "part",
      "number": "4",
      "heading": "Issue and revocation of ROCs",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "article/18",
      "kind": "article",
      "number": "18",
      "heading": "Issue of ROCs to generators and suppliers",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-18",
      "extent": null,
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/19",
      "kind": "article",
      "number": "19",
      "heading": "Issue of ROCs to agents",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-19",
      "extent": null,
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/20",
      "kind": "article",
      "number": "20",
      "heading": "Confirmations required from the person being issued with a ROC",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-20",
      "extent": null,
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/21",
      "kind": "article",
      "number": "21",
      "heading": "Further confirmations required for ROCs certifying matters within section 32B(3) and (5) of the Act where electricity generated otherwise than on land",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-21",
      "extent": null,
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/22",
      "kind": "article",
      "number": "22",
      "heading": "Further confirmations required for ROCs certifying matters within section 32B(3) to (6) of the Act",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-22",
      "extent": null,
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/23",
      "kind": "article",
      "number": "23",
      "heading": "Further confirmations required for ROCs certifying matters within section 32B(5), (6) and (8) of the Act",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-23",
      "extent": null,
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/24",
      "kind": "article",
      "number": "24",
      "heading": "Refusing to issue and revoking ROCs",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-24",
      "extent": null,
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/25",
      "kind": "article",
      "number": "25",
      "heading": "Where ROCs cannot be revoked",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-25",
      "extent": null,
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "part/5",
      "kind": "part",
      "number": "5",
      "heading": "RO eligible renewable output",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "article/26",
      "kind": "article",
      "number": "26",
      "heading": "Meaning of RO input electricity",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-26",
      "extent": null,
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/27",
      "kind": "article",
      "number": "27",
      "heading": "Meaning of RO output electricity",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-27",
      "extent": null,
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/28",
      "kind": "article",
      "number": "28",
      "heading": "ROCs to be issued by the Authority in respect of a generating station’s RO eligible renewable output",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-28",
      "extent": null,
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/29",
      "kind": "article",
      "number": "29",
      "heading": "Calculating a generating station’s RO eligible renewable output",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-29",
      "extent": null,
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/30",
      "kind": "article",
      "number": "30",
      "heading": "Calculating the RO eligible renewable output of a qualifying CHP station",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-30",
      "extent": null,
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "part/6",
      "kind": "part",
      "number": "6",
      "heading": "Banding",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "article/31",
      "kind": "article",
      "number": "31",
      "heading": "Calculating the amount of electricity generated by a particular category of generating capacity",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-31",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "article/32",
      "kind": "article",
      "number": "32",
      "heading": "Calculating the amount of electricity generated in a particular way",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-32",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "article/33",
      "kind": "article",
      "number": "33",
      "heading": "The amount of electricity to be stated in each ROC",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-33",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "article/34",
      "kind": "article",
      "number": "34",
      "heading": "Microgenerators",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-34",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "article/35",
      "kind": "article",
      "number": "35",
      "heading": "Electricity generated by qualifying CHP stations",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-35",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "article/36",
      "kind": "article",
      "number": "36",
      "heading": "Low-range co-firing of relevant energy crops",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-36",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "article/37",
      "kind": "article",
      "number": "37",
      "heading": "Generating stations which were accredited as at 11th July 2006",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-37",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "article/38",
      "kind": "article",
      "number": "38",
      "heading": "Landfill gas and sewage gas generating stations which were accredited, or held preliminary accreditation, as at 31st March 2009",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-38",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "article/39",
      "kind": "article",
      "number": "39",
      "heading": "Offshore wind turbines installed between 2006 and 2010",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-39",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "article/40",
      "kind": "article",
      "number": "40",
      "heading": "Wave and tidal stream generating stations",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-40",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "article/41",
      "kind": "article",
      "number": "41",
      "heading": "Generating stations in respect of which a statutory grant has been awarded",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-41",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "article/42",
      "kind": "article",
      "number": "42",
      "heading": "Review of banding provisions",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-42",
      "extent": null,
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "part/7",
      "kind": "part",
      "number": "7",
      "heading": "Cases and circumstances when a ROC must not be issued",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "article/43",
      "kind": "article",
      "number": "43",
      "heading": "Generating stations not compliant with accreditation or metering requirements",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-43",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/44",
      "kind": "article",
      "number": "44",
      "heading": "Maximum period of eligibility for ROCs",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-44",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/45",
      "kind": "article",
      "number": "45",
      "heading": "Generating stations using excluded capacity to generate electricity",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-45",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/46",
      "kind": "article",
      "number": "46",
      "heading": "Generating stations located outside England and Wales",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-46",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/47",
      "kind": "article",
      "number": "47",
      "heading": "Electricity supplied to customers in Northern Ireland",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-47",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/48",
      "kind": "article",
      "number": "48",
      "heading": "Combustion units in relation to which a capacity agreement has been issued",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-48",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/49",
      "kind": "article",
      "number": "49",
      "heading": "Electricity in respect of which a CFD or investment contract applies",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-49",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/50",
      "kind": "article",
      "number": "50",
      "heading": "Combustion units in relation to which a CFD or investment contract has been entered into",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-50",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/51",
      "kind": "article",
      "number": "51",
      "heading": "Generating stations supported or potentially eligible for support under a feed-in tariff scheme",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-51",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/52",
      "kind": "article",
      "number": "52",
      "heading": "Generating stations in respect of which a NFFO arrangement applied but was terminated",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-52",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/53",
      "kind": "article",
      "number": "53",
      "heading": "Non-commissioned generating stations in respect of which a NFFO arrangement applies",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-53",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/54",
      "kind": "article",
      "number": "54",
      "heading": "Large hydro generating stations first commissioned on or before 1st April 2002",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-54",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/55",
      "kind": "article",
      "number": "55",
      "heading": "Generating stations first commissioned before 1st January 1990",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-55",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/56",
      "kind": "article",
      "number": "56",
      "heading": "Generating stations using peat",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-56",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/57",
      "kind": "article",
      "number": "57",
      "heading": "Generating stations using landfill gas",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-57",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/58",
      "kind": "article",
      "number": "58",
      "heading": "Generating stations using gaseous fuel produced by means of gasification or pyrolysis",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-58",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/59",
      "kind": "article",
      "number": "59",
      "heading": "Generating stations using Solid Recovered Fuel",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-59",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/60",
      "kind": "article",
      "number": "60",
      "heading": "Generating stations using waste or fossil fuel",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-60",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/61",
      "kind": "article",
      "number": "61",
      "heading": "Circumstances in which ROCs must not be issued in respect of electricity generated from bioliquid",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-61",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/62",
      "kind": "article",
      "number": "62",
      "heading": "Common agricultural policy requirements in the case of bioliquids",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-62",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/63",
      "kind": "article",
      "number": "63",
      "heading": "Circumstances in which ROCs must not be issued in respect of electricity generated from solid or gaseous biomass",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-63",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/64",
      "kind": "article",
      "number": "64",
      "heading": "Cases where a renewables obligation certificate has already been issued",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-64",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/65",
      "kind": "article",
      "number": "65",
      "heading": "Cases and circumstances when a ROC must not be issued: general provisions",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-65",
      "extent": null,
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "part/8",
      "kind": "part",
      "number": "8",
      "heading": "Payments to discharge the renewables obligation, dealing with the buy-out and late payment funds, and mutualisation",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "article/66",
      "kind": "article",
      "number": "66",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-66",
      "extent": null,
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "article/67",
      "kind": "article",
      "number": "67",
      "heading": "Payments to discharge the renewables obligation",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-67",
      "extent": null,
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "article/68",
      "kind": "article",
      "number": "68",
      "heading": "Late payments to discharge the renewables obligation",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-68",
      "extent": null,
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "article/69",
      "kind": "article",
      "number": "69",
      "heading": "Dealing with the buy-out fund: payments into the Consolidated Fund and to the Northern Ireland authority",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-69",
      "extent": null,
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "article/70",
      "kind": "article",
      "number": "70",
      "heading": "Dealing with the late payment fund: payments into the Consolidated Fund and to the Northern Ireland authority",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-70",
      "extent": null,
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "article/71",
      "kind": "article",
      "number": "71",
      "heading": "Dealing with the buy-out and late payment funds: payments to UK suppliers",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-71",
      "extent": null,
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "article/72",
      "kind": "article",
      "number": "72",
      "heading": "Determining whether a relevant shortfall has occurred",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-72",
      "extent": null,
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "article/73",
      "kind": "article",
      "number": "73",
      "heading": "Calculating the total mutualisation sum in the case of a relevant shortfall",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-73",
      "extent": null,
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "article/74",
      "kind": "article",
      "number": "74",
      "heading": "Payments to be made by suppliers towards the total mutualisation sum",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-74",
      "extent": null,
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "article/75",
      "kind": "article",
      "number": "75",
      "heading": "Circumstances in which payments towards the total mutualisation sum are to be re-calculated",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-75",
      "extent": null,
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "article/76",
      "kind": "article",
      "number": "76",
      "heading": "Re-calculated payments to be made by suppliers towards the total mutualisation sum and repayments by the Authority",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-76",
      "extent": null,
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "article/77",
      "kind": "article",
      "number": "77",
      "heading": "Payments to be made to suppliers out of the mutualisation fund",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-77",
      "extent": null,
      "status": null,
      "parent": "part/8"
    },
    {
      "path": "part/9",
      "kind": "part",
      "number": "9",
      "heading": "Provision of information",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "article/78",
      "kind": "article",
      "number": "78",
      "heading": "Provision of information required by the Authority to carry out its functions",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-78",
      "extent": null,
      "status": null,
      "parent": "part/9"
    },
    {
      "path": "article/79",
      "kind": "article",
      "number": "79",
      "heading": "Provision of information to determine whether a supplier is discharging its renewables obligation",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-79",
      "extent": null,
      "status": null,
      "parent": "part/9"
    },
    {
      "path": "article/80",
      "kind": "article",
      "number": "80",
      "heading": "Provision of information to determine whether a ROC is to be, or should have been, issued",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-80",
      "extent": null,
      "status": null,
      "parent": "part/9"
    },
    {
      "path": "article/81",
      "kind": "article",
      "number": "81",
      "heading": "Notification by the operator of a low-range co-firing combustion unit",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-81",
      "extent": null,
      "status": null,
      "parent": "part/9"
    },
    {
      "path": "article/82",
      "kind": "article",
      "number": "82",
      "heading": "Information to be provided to the Authority where electricity is generated from biomass",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-82",
      "extent": null,
      "status": null,
      "parent": "part/9"
    },
    {
      "path": "article/83",
      "kind": "article",
      "number": "83",
      "heading": "Bioliquid sustainability audit report",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-83",
      "extent": null,
      "status": null,
      "parent": "part/9"
    },
    {
      "path": "article/84",
      "kind": "article",
      "number": "84",
      "heading": "Solid and gaseous biomass sustainability audit report",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-84",
      "extent": null,
      "status": null,
      "parent": "part/9"
    },
    {
      "path": "part/10",
      "kind": "part",
      "number": "10",
      "heading": "Functions of the Authority",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "article/85",
      "kind": "article",
      "number": "85",
      "heading": "Determination of matters by the Authority",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-85",
      "extent": null,
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "article/86",
      "kind": "article",
      "number": "86",
      "heading": "Functions of the Authority",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-86",
      "extent": null,
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "article/87",
      "kind": "article",
      "number": "87",
      "heading": "Exchange of information with the Northern Ireland Authority",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-87",
      "extent": null,
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "article/88",
      "kind": "article",
      "number": "88",
      "heading": "Preliminary accreditation of generating stations",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-88",
      "extent": null,
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "article/89",
      "kind": "article",
      "number": "89",
      "heading": "Accreditation of generating stations",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-89",
      "extent": null,
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "article/90",
      "kind": "article",
      "number": "90",
      "heading": "Preliminary accreditation and accreditation: common provisions",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-90",
      "extent": null,
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "article/91",
      "kind": "article",
      "number": "91",
      "heading": "Registration of offshore wind turbines",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-91",
      "extent": null,
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "article/92",
      "kind": "article",
      "number": "92",
      "heading": "Registration of additional capacity",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-92",
      "extent": null,
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "article/93",
      "kind": "article",
      "number": "93",
      "heading": "ROC Register",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-93",
      "extent": null,
      "status": null,
      "parent": "part/10"
    },
    {
      "path": "part/11",
      "kind": "part",
      "number": "11",
      "heading": "Modifications and transitional provisions",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "article/94",
      "kind": "article",
      "number": "94",
      "heading": "Modification of this Order in relation to microgenerators in certain circumstances",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-94",
      "extent": null,
      "status": null,
      "parent": "part/11"
    },
    {
      "path": "article/95",
      "kind": "article",
      "number": "95",
      "heading": "Revocation and savings",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-95",
      "extent": null,
      "status": null,
      "parent": "part/11"
    },
    {
      "path": "article/96",
      "kind": "article",
      "number": "96",
      "heading": "Transitional provisions",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-96",
      "extent": null,
      "status": null,
      "parent": "part/11"
    },
    {
      "path": "article/97",
      "kind": "article",
      "number": "97",
      "heading": "Consequential amendments to the Renewables Obligation Closure Order 2014",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/article-97",
      "extent": null,
      "status": null,
      "parent": "part/11"
    },
    {
      "path": "signature",
      "kind": "signature",
      "number": null,
      "heading": "Signature",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/signature",
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/1",
      "kind": "schedule",
      "number": "1",
      "heading": "GREENHOUSE GAS CRITERIA FOR BIOLIQUID",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/1/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-1/paragraph-1",
      "extent": null,
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "The greenhouse gas criteria",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-1/paragraph-2",
      "extent": null,
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": "Calculating the percentage difference",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-1/paragraph-3",
      "extent": null,
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": "Calculating the percentage difference",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-1/paragraph-4",
      "extent": null,
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": "Calculating the percentage difference",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-1/paragraph-5",
      "extent": null,
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": "Calculating the percentage difference",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-1/paragraph-6",
      "extent": null,
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/2",
      "kind": "schedule",
      "number": "2",
      "heading": "GREENHOUSE GAS CRITERIA FOR SOLID AND GASEOUS BIOMASS",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/2/part/1",
      "kind": "part",
      "number": "1",
      "heading": "Greenhouse gas criteria",
      "url": null,
      "extent": null,
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-2/paragraph-1",
      "extent": null,
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "The greenhouse gas criteria",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-2/paragraph-2",
      "extent": null,
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": "Calculating the greenhouse gas emissions",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-2/paragraph-3",
      "extent": null,
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": "Calculating the greenhouse gas emissions",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-2/paragraph-4",
      "extent": null,
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": "Calculating the greenhouse gas emissions",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-2/paragraph-5",
      "extent": null,
      "status": null,
      "parent": "schedule/2/part/1"
    },
    {
      "path": "schedule/2/part/2",
      "kind": "part",
      "number": "2",
      "heading": "Actual value method",
      "url": null,
      "extent": null,
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-2/paragraph-6",
      "extent": null,
      "status": null,
      "parent": "schedule/2/part/2"
    },
    {
      "path": "schedule/2/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-2/paragraph-7",
      "extent": null,
      "status": null,
      "parent": "schedule/2/part/2"
    },
    {
      "path": "schedule/2/part/3",
      "kind": "part",
      "number": "3",
      "heading": "Default value method",
      "url": null,
      "extent": null,
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-2/paragraph-8",
      "extent": null,
      "status": null,
      "parent": "schedule/2/part/3"
    },
    {
      "path": "schedule/2/paragraph/9",
      "kind": "paragraph",
      "number": "9",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-2/paragraph-9",
      "extent": null,
      "status": null,
      "parent": "schedule/2/part/3"
    },
    {
      "path": "schedule/2/part/4",
      "kind": "part",
      "number": "4",
      "heading": "Default greenhouse gas emissions from the production of biomass",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-2/part-4",
      "extent": null,
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/3",
      "kind": "schedule",
      "number": "3",
      "heading": "LAND CRITERIA",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/3/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-3/paragraph-1",
      "extent": null,
      "status": null,
      "parent": "schedule/3"
    },
    {
      "path": "schedule/3/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "Land criteria: bioliquids",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-3/paragraph-2",
      "extent": null,
      "status": null,
      "parent": "schedule/3"
    },
    {
      "path": "schedule/3/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": "Land criteria: woody biomass",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-3/paragraph-3",
      "extent": null,
      "status": null,
      "parent": "schedule/3"
    },
    {
      "path": "schedule/3/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": "Land criteria: other fuels",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-3/paragraph-4",
      "extent": null,
      "status": null,
      "parent": "schedule/3"
    },
    {
      "path": "schedule/3/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": "Protected sources",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-3/paragraph-5",
      "extent": null,
      "status": null,
      "parent": "schedule/3"
    },
    {
      "path": "schedule/3/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": "Sustainable source",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-3/paragraph-6",
      "extent": null,
      "status": null,
      "parent": "schedule/3"
    },
    {
      "path": "schedule/3/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": "Exempt purposes",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-3/paragraph-7",
      "extent": null,
      "status": null,
      "parent": "schedule/3"
    },
    {
      "path": "schedule/4",
      "kind": "schedule",
      "number": "4",
      "heading": "THE ROC REGISTER",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/4/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-1",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-2",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-3",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-4",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-5",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-6",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-7",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-8",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/9",
      "kind": "paragraph",
      "number": "9",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-9",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/10",
      "kind": "paragraph",
      "number": "10",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-10",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/11",
      "kind": "paragraph",
      "number": "11",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-11",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/12",
      "kind": "paragraph",
      "number": "12",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-12",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/13",
      "kind": "paragraph",
      "number": "13",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-13",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/14",
      "kind": "paragraph",
      "number": "14",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-14",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/paragraph/15",
      "kind": "paragraph",
      "number": "15",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-4/paragraph-15",
      "extent": null,
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/5",
      "kind": "schedule",
      "number": "5",
      "heading": "ELECTRICITY TO BE STATED IN ROCs",
      "url": null,
      "extent": null,
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/5/part/1",
      "kind": "part",
      "number": "1",
      "heading": "INTERPRETATION",
      "url": null,
      "extent": null,
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-5/paragraph-1",
      "extent": null,
      "status": null,
      "parent": "schedule/5/part/1"
    },
    {
      "path": "schedule/5/part/2",
      "kind": "part",
      "number": "2",
      "heading": "AMOUNT OF ELECTRICITY TO BE STATED IN ROCs ISSUED FOR ELECTRICITY GENERATED USING PRE-2013 CAPACITY",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-5/part-2",
      "extent": null,
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/part/3",
      "kind": "part",
      "number": "3",
      "heading": "AMOUNT OF ELECTRICITY TO BE STATED IN ROCs ISSUED FOR ELECTRICITY GENERATED USING 2013/14 CAPACITY, 2014/15 CAPACITY, 2015/16 CAPACITY OR POST-2016 CAPACITY",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-5/part-3",
      "extent": null,
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/part/4",
      "kind": "part",
      "number": "4",
      "heading": "AMOUNT OF ELECTRICITY TO BE STATED IN ROCs ISSUED FOR ELECTRICITY GENERATED BY MICROGENERATORS TO WHICH ARTICLE 34 APPLIES",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-5/part-4",
      "extent": null,
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/part/5",
      "kind": "part",
      "number": "5",
      "heading": "AMOUNT OF ELECTRICITY TO BE STATED IN ROCs ISSUED FOR ELECTRICITY GENERATED USING PRE-2013 CAPACITY OR 2013/15 CAPACITY WHERE ARTICLE 35(3) OR (4) APPLIES",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-5/part-5",
      "extent": null,
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/part/6",
      "kind": "part",
      "number": "6",
      "heading": "AMOUNT OF ELECTRICITY TO BE STATED IN ROCs ISSUED FOR ELECTRICITY GENERATED USING 2015/16 CAPACITY WHERE ARTICLE 35(5) APPLIES",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-5/part-6",
      "extent": null,
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/part/7",
      "kind": "part",
      "number": "7",
      "heading": "AMOUNT OF ELECTRICITY TO BE STATED IN ROCs ISSUED FOR ELECTRICITY GENERATED USING POST-2016 CAPACITY WHERE ARTICLE 35(6) APPLIES",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/schedule-5/part-7",
      "extent": null,
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "note",
      "kind": "note",
      "number": null,
      "heading": "Explanatory note",
      "url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/note",
      "extent": null,
      "status": null,
      "parent": null
    }
  ],
  "outstanding_effects": [],
  "made_under": [
    {
      "id": "ukpga/1989/29",
      "title": "Electricity Act 1989",
      "url": "https://openlegislation.uk/electricity-act-1989",
      "provisions": []
    },
    {
      "id": "ukpga/1972/68",
      "title": "European Communities Act 1972 (repealed)",
      "url": "https://openlegislation.uk/european-communities-act-1972-repealed",
      "provisions": []
    }
  ],
  "changes_made_to": 0,
  "changes_made_to_url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/changes.json",
  "changes_made_by": 0,
  "changes_made_by_url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/changes/by-it.json",
  "instruments_made_under": 0,
  "instruments_made_under_url": "https://openlegislation.uk/draft-renewables-obligation-order-2015/instruments.json",
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/ukdsi/2015/9780111138359",
    "retrieved_at": "2026-10-30T15:09:24.028688+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}