Article 12 Wave and tidal stream generating stations
(1)
Article 30Bf1 is amended as follows.
(2)
In paragraph (4), before “renewable output” insert “RO eligible”.
(3)
In paragraph (6) omit the definition of “total installed capacity”.
Annotations
Footnotes
- f1
-
Article 30B was inserted by S.S.I. 2013/116.