Article 10 Calculation C
(1)
The figure representing the sum of the estimates in articles 7 and 8, multiplied by 0.2 and rounded to the nearest whole number (one half being rounded upwards), is calculation C for that obligation period.
(2)
References to calculation C are to be construed accordingly.