Regulation 6 Periodical inspection of high-risk reservoirs
An undertaker must have a high-risk reservoir to which section 10(2) of the 1975 Act applies inspected at each of the following times—
before the end of the period of two years beginning on the date on which a final certificate is given by the construction engineer in relation to the reservoir under section 7(3) of the 1975 Act;
before the end of the period of six months beginning on the date of completion of any alteration to the reservoir which—
does not increase or decrease its capacity;
is such as might affect its safety; and
has not been designed and supervised by a qualified civil engineer;
at any time recommended by the supervising engineer under section 12(3) of the 1975 Act;
at any time recommended in the report of the inspecting engineer made under section 10(3) of the 1975 Act;
within two years of the designation of the reservoir as high-risk where there is no requirement to inspect the reservoir under sub-paragraph (a).
An undertaker must have a high-risk reservoir to which section 10(2) of the 1975 Act applies inspected before the end of the period of ten years beginning on the date on which the last inspection of the reservoir was completed.
The requirement to have a reservoir inspected under this regulation is not fulfilled where the inspection is limited to part of the reservoir.