{
  "url": "https://openlegislation.uk/draft-rosyth-international-container-terminal-harbour-revision-order-2013/article-5",
  "json_url": "https://openlegislation.uk/draft-rosyth-international-container-terminal-harbour-revision-order-2013/article-5.json",
  "legislation": "sdsi/2013/9780111021149",
  "legislation_title": "The Rosyth International Container Terminal (Harbour Revision) Order 2013",
  "legislation_url": "https://openlegislation.uk/draft-rosyth-international-container-terminal-harbour-revision-order-2013",
  "path": "article/5",
  "kind": "article",
  "number": "5",
  "heading": "Power to construct works",
  "text": "(1) The Company may within the works site construct and maintain the following works—\nWork No. 1 – quay walls, sea walls and revetment at the locations which are shown on sheet no. III of the deposited plans;\nWork No. 2 – in-filling of the void behind the quay walls formed by Work No. 1;\nWork No. 3 – lighting columns with elevations not exceeding 25 metres in height;\nWork No. 4 – an electrical substation extending to approximately 70 square metres at the location shown on sheet no. III of the deposited plans;\nWork No. 5 – a truck holding area at the location shown on sheet no. III of the deposited plans;\nWork No. 6 – a single storey welfare building at the location shown on sheet no. III of the deposited plans;\nWork No. 7 – a single storey container freight station building extending to approximately 3,000 square metres, with a floor level suitable to receive containers directly off truck trailers, and comprising facilities for the inspection and search of vehicles and containers, offices, staff accommodation, interview rooms and toilets, together with entry and exit gatehouses equipped with overhead inspection gantries under cover of an overall roof, at the location shown on sheet no. III of the deposited plans;\nWork No. 8 – a weighbridge adjacent to Work No. 7;\nWork No. 9 – security fencing of a design and specification to satisfy HM Revenue & Customs and ISPS port security code requirements, erected where shown by a blue line on sheet no. III of the deposited plans;\nWork No. 10 – a two storey administration building extending to approximately 1,000 square metres and separate single storey services, canteen and office buildings at the respective locations shown on sheet no. III of the deposited plans;\nWork No. 11 – a single storey workshop building, a single storey equipment maintenance building and an RTG maintenance area at the respective locations shown on sheet no. III of the deposited plans;\nWork No. 12 – two car parking areas, each comprising forty in number spaces of 5.5 metres by 2.8 metres, at the locations shown on sheet no. III of the deposited plans;\nWork No. 13 – rail mounted ship to shore cranes, not exceeding two in number with an elevation not exceeding 50 metres in height as shown on sheet nos. III and V of the deposited plans;\nWork No. 14 –mobile harbour cranes, not exceeding two in number with an elevation (with boom up) not exceeding 40 metres in height as shown on sheet nos. III and V of the deposited plans;\nWork No. 15 – container stack areas in which containers shall not be stacked more than five high or above an elevation of 15 metres in height as shown on sheet nos. III and V of the deposited plans;\nWork No. 16 – rubber tyre gantry cranes used for stacking or otherwise handling containers with an elevation not exceeding 30 metres in height as shown on sheet no. V of the deposited plans;\nWork No. 17 – preparation for use as a berthing pocket of the proportion of the base of the existing void at the works site as remains exposed after completion of Work No. 1;\nWork No. 18 – removal of the section of sea wall embankment behind and revetment in front shown crosshatched on sheet no. IV of the deposited plans, reduction of underlying bed level and stabilisation of the entrance portal so created and flooding of the berthing pocket formed by such and Work No. 1;\nWork No. 19 – dolphin structures and associated walkways at the locations shown on sheet no. III of the deposited plans;\nWork No. 20 – repair and maintenance of the Contractor’s Jetty with associated piling; and\nWork No 21 – an acoustic barrier and visual screen wall 3 metres in height along the port limits boundary between the points marked 32 and 33 on Sheet I(1) rev D of the deposited plans.\n(2) Notwithstanding anything in any other enactment, the Company may for the purpose of constructing the works authorised by paragraph (1) dismantle, remove, deal with and dispose of the whole or any part or parts of any vegetation and of all structures and equipment lying within the works site (including the Contractor’s Jetty) and enclose and reclaim any part of the bed of the Forth and the foreshore; and any public rights over the same are extinguished.\n(3) The Company may from time to time, within the works site, alter, enlarge, replace, relay, extend or reconstruct temporarily or permanently the works and may maintain and use the same as altered, enlarged, replaced, relayed, extended or reconstructed.\n(4) The Company may authorise any person to carry out the works.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/sdsi/2013/9780111021149/article/5",
    "retrieved_at": "2026-10-30T15:36:05.576664+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}