# The Waste Management Licensing (Scotland) Regulations 2011, Part II: WASTE DISPOSAL OPERATIONS


NB. This Part of this Schedule is intended to list disposal operations such as they occur in practice. In accordance with Article 13 of the Directive waste must be disposed of without endangering human health and without the use of processes or methods likely to harm the environment.
Operation Code
Description
(1)The operations listed in this Part of this Schedule are listed in accordance with Annex I of the Directive.
D1
Deposit into or onto land (e.g. landfill etc.).
D2
Land treatment (e.g. biodegradation of liquid or sludge discards in soils, etc.).
D3
Deep injection (e.g. injection of pumpable discards into wells, salt domes or naturally occurring repositories, etc.).
D4
Surface impoundment (e.g. placement of liquid or sludge discards into pits, ponds or lagoons, etc.).
D5
Specially engineered landfill (e.g. placement into lined discrete cells which are capped and isolated from one another and the environment, etc.).
D6
Release into a water body except seas/oceans.
D7
Release into seas/oceans including sea-bed insertion.
D8
Biological treatment not listed elsewhere in this Part of this Schedule which results in final compounds or mixtures which are discarded by means of any of the operations listed as D1 to D12 in this Part of this Schedule.
D9
Physico-chemical treatment not listed elsewhere in this Part of this Schedule which results in final compounds or mixtures which are discarded by means of any of the operations listed as D1 to D12 in this Part of this Schedule (e.g. evaporation drying, calcination, etc.).
D10
Incineration on land.
D11
Incineration at sea.
D12
Permanent storage (emplacement of containers in a mine, etc.).
D13
Blending or mixing of waste prior to submission to any of the operations listed as D1 to D12 in this Part of this Schedule.
If there is no other D code appropriate, this may include preliminary operations prior to disposal, including pre-processing such as sorting, crushing, compacting, pelletising, drying, shredding, conditioning or separating prior to submission to any of operations D1 to D12.
D14
Repackaging of waste prior to submission to any of the operations listed as D1 to D13 in this Part of this Schedule.
D15
Storage of waste pending any of the operations listed as D1 to D14 in this Part of this Schedule, but excluding preliminary storage referred to in Article 3(10) of the Directive, pending collection, on the site where the waste is produced.

---
Source: https://www.legislation.gov.uk/sdsi/2011/9780111012147/schedule/4/part/II (the official version)
Page: https://openlegislation.uk/draft-waste-management-licensing-scotland-regulations-2011/schedule-4/part-II
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

