  "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019",
  "json_url": "https://openlegislation.uk/drax-power-generating-stations-order-2019.json",
  "id": "uksi/2019/1315",
  "title": "The Drax Power (Generating Stations) Order 2019",
  "short_title": "Drax Power (Generating Stations) 2019",
  "long_title": "This Order authorises Drax Power Limited (referred to in this Order as the undertaker) to construct, operate and maintain up to two gas fired electricity generating stations and up to two battery storage energy facilities. The Order would permit the undertaker to acquire, compulsorily or by agreement, land and rights in land and to use land for this purpose.",
  "citation": "S.I. 2019/1315",
  "type": "uksi",
  "year": "2019",
  "number": "1315",
  "version": "current",
  "date": "2019-10-04",
  "revised": true,
  "valid_from": "2020-08-19",
  "extent": "E+W",
  "unapplied_effects": 0,
  "provisions": [
    {
      "path": "introduction",
      "kind": "introduction",
      "number": null,
      "heading": "Introductory text",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/introduction",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "part/1",
      "kind": "part",
      "number": "1",
      "heading": "PRELIMINARY",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/1",
      "kind": "article",
      "number": "1",
      "heading": "Citation and commencement",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-1",
      "extent": "E+W",
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "article/2",
      "kind": "article",
      "number": "2",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-2",
      "extent": "E+W",
      "status": null,
      "parent": "part/1"
    },
    {
      "path": "part/2",
      "kind": "part",
      "number": "2",
      "heading": "PRINCIPAL POWERS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/3",
      "kind": "article",
      "number": "3",
      "heading": "Development consent etc. granted by the Order",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-3",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/4",
      "kind": "article",
      "number": "4",
      "heading": "Maintenance of authorised development",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-4",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/5",
      "kind": "article",
      "number": "5",
      "heading": "Operation of authorised development",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-5",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/6",
      "kind": "article",
      "number": "6",
      "heading": "Benefit of the Order",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-6",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/7",
      "kind": "article",
      "number": "7",
      "heading": "Consent to transfer benefit of the Order",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-7",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "article/8",
      "kind": "article",
      "number": "8",
      "heading": "Application and modification of statutory provisions",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-8",
      "extent": "E+W",
      "status": null,
      "parent": "part/2"
    },
    {
      "path": "part/3",
      "kind": "part",
      "number": "3",
      "heading": "STREETS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/9",
      "kind": "article",
      "number": "9",
      "heading": "Street works",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-9",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/10",
      "kind": "article",
      "number": "10",
      "heading": "Power to alter layout, etc., of streets",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-10",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/11",
      "kind": "article",
      "number": "11",
      "heading": "Construction and maintenance of new or altered means of access",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-11",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/12",
      "kind": "article",
      "number": "12",
      "heading": "Temporary stopping up of streets and public rights of way",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-12",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/13",
      "kind": "article",
      "number": "13",
      "heading": "Permanent stopping up of public rights of way",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-13",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/14",
      "kind": "article",
      "number": "14",
      "heading": "Access to works",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-14",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "article/15",
      "kind": "article",
      "number": "15",
      "heading": "Agreements with street authorities",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-15",
      "extent": "E+W",
      "status": null,
      "parent": "part/3"
    },
    {
      "path": "part/4",
      "kind": "part",
      "number": "4",
      "heading": "SUPPLEMENTAL POWERS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/16",
      "kind": "article",
      "number": "16",
      "heading": "Discharge of water",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-16",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/17",
      "kind": "article",
      "number": "17",
      "heading": "Authority to survey and investigate the land",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-17",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "article/18",
      "kind": "article",
      "number": "18",
      "heading": "Removal of human remains",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-18",
      "extent": "E+W",
      "status": null,
      "parent": "part/4"
    },
    {
      "path": "part/5",
      "kind": "part",
      "number": "5",
      "heading": "POWERS OF ACQUISITION",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/19",
      "kind": "article",
      "number": "19",
      "heading": "Compulsory acquisition of land",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-19",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/20",
      "kind": "article",
      "number": "20",
      "heading": "Statutory authority to override easements and other rights",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-20",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/21",
      "kind": "article",
      "number": "21",
      "heading": "Time limit for exercise of authority to acquire land compulsorily",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-21",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/22",
      "kind": "article",
      "number": "22",
      "heading": "Compulsory acquisition of rights etc.",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-22",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/23",
      "kind": "article",
      "number": "23",
      "heading": "Private rights",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-23",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/24",
      "kind": "article",
      "number": "24",
      "heading": "Application of the Compulsory Purchase (Vesting Declarations) Act 1981",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-24",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/25",
      "kind": "article",
      "number": "25",
      "heading": "Acquisition of subsoil only",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-25",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/26",
      "kind": "article",
      "number": "26",
      "heading": "Modification of Part 1 of the Compulsory Purchase Act 1965",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-26",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/27",
      "kind": "article",
      "number": "27",
      "heading": "Rights under or over streets",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-27",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/28",
      "kind": "article",
      "number": "28",
      "heading": "Temporary use of land for carrying out the authorised development",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-28",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/29",
      "kind": "article",
      "number": "29",
      "heading": "Temporary use of land for maintaining the authorised development",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-29",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/30",
      "kind": "article",
      "number": "30",
      "heading": "Statutory undertakers",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-30",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/31",
      "kind": "article",
      "number": "31",
      "heading": "Apparatus and rights of statutory undertakers in streets",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-31",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/32",
      "kind": "article",
      "number": "32",
      "heading": "Recovery of costs of new connections",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-32",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "article/33",
      "kind": "article",
      "number": "33",
      "heading": "Compulsory acquisition of land – incorporation of the mineral code",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-33",
      "extent": "E+W",
      "status": null,
      "parent": "part/5"
    },
    {
      "path": "part/6",
      "kind": "part",
      "number": "6",
      "heading": "OPERATIONS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/34",
      "kind": "article",
      "number": "34",
      "heading": "Felling or lopping of trees and removal of hedgerows",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-34",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "article/35",
      "kind": "article",
      "number": "35",
      "heading": "Protective works to buildings",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-35",
      "extent": "E+W",
      "status": null,
      "parent": "part/6"
    },
    {
      "path": "part/7",
      "kind": "part",
      "number": "7",
      "heading": "MISCELLANEOUS AND GENERAL",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "article/36",
      "kind": "article",
      "number": "36",
      "heading": "Protective provisions",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-36",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/37",
      "kind": "article",
      "number": "37",
      "heading": "Application of landlord and tenant law",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-37",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/38",
      "kind": "article",
      "number": "38",
      "heading": "Operational land for purposes of the 1990 Act",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-38",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/39",
      "kind": "article",
      "number": "39",
      "heading": "Defence to proceedings in respect of statutory nuisance",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-39",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/40",
      "kind": "article",
      "number": "40",
      "heading": "Certification of plans etc.",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-40",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/41",
      "kind": "article",
      "number": "41",
      "heading": "Service of notices",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-41",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/42",
      "kind": "article",
      "number": "42",
      "heading": "Procedure in relation to certain approvals etc.",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-42",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/43",
      "kind": "article",
      "number": "43",
      "heading": "Arbitration",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-43",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "article/44",
      "kind": "article",
      "number": "44",
      "heading": "Guarantees in respect of payment of compensation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/article-44",
      "extent": "E+W",
      "status": null,
      "parent": "part/7"
    },
    {
      "path": "signature",
      "kind": "signature",
      "number": null,
      "heading": "Signature",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/signature",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/1",
      "kind": "schedule",
      "number": "1",
      "heading": "AUTHORISED DEVELOPMENT",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/1/paragraph/wrapper1n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper1n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper2n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper2n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper3n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper3n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper4n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper4n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper5n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper5n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper6n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper6n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper7n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper7n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper8n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper8n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper9n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper9n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper10n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper10n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper11n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper11n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper12n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper12n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper13n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper13n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper14n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper14n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper15n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper15n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper16n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper16n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/1/paragraph/wrapper17n1",
      "kind": "paragraph",
      "number": null,
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper17n1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/1"
    },
    {
      "path": "schedule/2",
      "kind": "schedule",
      "number": "2",
      "heading": "REQUIREMENTS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/2/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "Commencement of the authorised development",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": "Phasing of the authorised development",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": "Notice of start of commissioning and notice of date of full commissioning",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": "Requirement for written approval",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": "Approved details and amendments to them",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": "Detailed design approval",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-7",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": "Provision of landscape and biodiversity mitigation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-8",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/9",
      "kind": "paragraph",
      "number": "9",
      "heading": "Public rights of way diversions",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-9",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/10",
      "kind": "paragraph",
      "number": "10",
      "heading": "External lighting during construction and operation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-10",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/11",
      "kind": "paragraph",
      "number": "11",
      "heading": "Highway accesses and passing place during construction",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-11",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/12",
      "kind": "paragraph",
      "number": "12",
      "heading": "Means of enclosure",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-12",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/13",
      "kind": "paragraph",
      "number": "13",
      "heading": "Surface water drainage",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-13",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/14",
      "kind": "paragraph",
      "number": "14",
      "heading": "Flood risk mitigation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-14",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/15",
      "kind": "paragraph",
      "number": "15",
      "heading": "Ground conditions",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-15",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/16",
      "kind": "paragraph",
      "number": "16",
      "heading": "Archaeology",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-16",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/17",
      "kind": "paragraph",
      "number": "17",
      "heading": "Construction environmental management plan",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-17",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/18",
      "kind": "paragraph",
      "number": "18",
      "heading": "Construction traffic management plan",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-18",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/19",
      "kind": "paragraph",
      "number": "19",
      "heading": "Construction worker travel plan",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-19",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/20",
      "kind": "paragraph",
      "number": "20",
      "heading": "Construction hours",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-20",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/21",
      "kind": "paragraph",
      "number": "21",
      "heading": "Control of noise: operation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-21",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/22",
      "kind": "paragraph",
      "number": "22",
      "heading": "Carbon capture readiness reserve space",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-22",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/23",
      "kind": "paragraph",
      "number": "23",
      "heading": "Carbon capture readiness monitoring report",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-23",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/24",
      "kind": "paragraph",
      "number": "24",
      "heading": "Air safety",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-24",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/25",
      "kind": "paragraph",
      "number": "25",
      "heading": "Local liaison committee",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-25",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/26",
      "kind": "paragraph",
      "number": "26",
      "heading": "Decommissioning environmental management plan",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-26",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/27",
      "kind": "paragraph",
      "number": "27",
      "heading": "Decommissioning traffic management plan",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-27",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/2/paragraph/28",
      "kind": "paragraph",
      "number": "28",
      "heading": "Combined heat and power",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-2/paragraph-28",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/2"
    },
    {
      "path": "schedule/3",
      "kind": "schedule",
      "number": "3",
      "heading": "STREETS SUBJECT TO STREET WORKS",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-3",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/4",
      "kind": "schedule",
      "number": "4",
      "heading": "STREETS SUBJECT TO PERMANENT AND TEMPORARY ALTERATION OF LAYOUT",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/4/part/1",
      "kind": "part",
      "number": "1",
      "heading": "PERMANENT ALTERATION OF LAYOUT",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-4/part-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/4/part/2",
      "kind": "part",
      "number": "2",
      "heading": "TEMPORARY ALTERATION OF LAYOUT",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-4/part-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/4"
    },
    {
      "path": "schedule/5",
      "kind": "schedule",
      "number": "5",
      "heading": "ACCESS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/5/part/1",
      "kind": "part",
      "number": "1",
      "heading": "THOSE PARTS OF THE ACCESS TO BE MAINTAINED AT THE PUBLIC EXPENSE",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-5/part-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/part/2",
      "kind": "part",
      "number": "2",
      "heading": "THOSE PARTS OF THE ACCESS TO BE MAINTAINED BY THE STREET AUTHORITY",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-5/part-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/5/part/3",
      "kind": "part",
      "number": "3",
      "heading": "THOSE WORKS TO RESTORE THE TEMPORARY ACCESSES WHICH WILL BE MAINTAINED BY THE STREET AUTHORITY",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-5/part-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/5"
    },
    {
      "path": "schedule/6",
      "kind": "schedule",
      "number": "6",
      "heading": "STREETS AND PUBLIC RIGHTS OF WAY TO BE TEMPORARILY STOPPED UP",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/6/part/1",
      "kind": "part",
      "number": "1",
      "heading": "STREETS TO BE TEMPORARILY STOPPED UP ETC.",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-6/part-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/6/part/2",
      "kind": "part",
      "number": "2",
      "heading": "PUBLIC RIGHTS OF WAY TO BE TEMPORARILY STOPPED UP ETC.",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-6/part-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/6"
    },
    {
      "path": "schedule/7",
      "kind": "schedule",
      "number": "7",
      "heading": "PUBLIC RIGHTS OF WAY TO BE PERMANENTLY STOPPED UP",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-7",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/8",
      "kind": "schedule",
      "number": "8",
      "heading": "LAND IN WHICH ONLY NEW RIGHTS ETC. MAY BE ACQUIRED",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/8/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-8/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/8"
    },
    {
      "path": "schedule/9",
      "kind": "schedule",
      "number": "9",
      "heading": "MODIFICATION OF COMPENSATION AND COMPULSORY PURCHASE ENACTMENTS FOR CREATION OF NEW RIGHTS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/9/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Compensation enactments",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-9/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/9"
    },
    {
      "path": "schedule/9/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-9/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/9"
    },
    {
      "path": "schedule/9/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-9/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/9"
    },
    {
      "path": "schedule/9/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": "Application of Part 1 of the 1965 Act",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-9/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/9"
    },
    {
      "path": "schedule/9/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-9/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/9"
    },
    {
      "path": "schedule/10",
      "kind": "schedule",
      "number": "10",
      "heading": "LAND OF WHICH TEMPORARY POSSESSION MAY BE TAKEN",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-10",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/11",
      "kind": "schedule",
      "number": "11",
      "heading": "PROCEDURE FOR DISCHARGE",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/11/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-11/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/11"
    },
    {
      "path": "schedule/11/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": "Applications made under Requirements",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-11/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/11"
    },
    {
      "path": "schedule/11/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": "Further information and consultation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-11/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/11"
    },
    {
      "path": "schedule/11/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": "Fees",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-11/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/11"
    },
    {
      "path": "schedule/11/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": "Appeals",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-11/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/11"
    },
    {
      "path": "schedule/12",
      "kind": "schedule",
      "number": "12",
      "heading": "PROTECTIVE PROVISIONS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/12/part/1",
      "kind": "part",
      "number": "1",
      "heading": "FOR THE PROTECTION OF ELECTRICITY, GAS, WATER AND SEWERAGE UNDERTAKERS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12"
    },
    {
      "path": "schedule/12/paragraph/1",
      "kind": "paragraph",
      "number": "1",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/1"
    },
    {
      "path": "schedule/12/paragraph/2",
      "kind": "paragraph",
      "number": "2",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/1"
    },
    {
      "path": "schedule/12/paragraph/3",
      "kind": "paragraph",
      "number": "3",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/1"
    },
    {
      "path": "schedule/12/paragraph/4",
      "kind": "paragraph",
      "number": "4",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-4",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/1"
    },
    {
      "path": "schedule/12/paragraph/5",
      "kind": "paragraph",
      "number": "5",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-5",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/1"
    },
    {
      "path": "schedule/12/paragraph/6",
      "kind": "paragraph",
      "number": "6",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-6",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/1"
    },
    {
      "path": "schedule/12/paragraph/7",
      "kind": "paragraph",
      "number": "7",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-7",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/1"
    },
    {
      "path": "schedule/12/paragraph/8",
      "kind": "paragraph",
      "number": "8",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-8",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/1"
    },
    {
      "path": "schedule/12/paragraph/9",
      "kind": "paragraph",
      "number": "9",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-9",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/1"
    },
    {
      "path": "schedule/12/paragraph/10",
      "kind": "paragraph",
      "number": "10",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-10",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/1"
    },
    {
      "path": "schedule/12/paragraph/11",
      "kind": "paragraph",
      "number": "11",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-11",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/1"
    },
    {
      "path": "schedule/12/part/2",
      "kind": "part",
      "number": "2",
      "heading": "FOR THE PROTECTION OF OPERATORS OF ELECTRONIC COMMUNICATIONS CODE NETWORKS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12"
    },
    {
      "path": "schedule/12/paragraph/12",
      "kind": "paragraph",
      "number": "12",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-12",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/2"
    },
    {
      "path": "schedule/12/paragraph/13",
      "kind": "paragraph",
      "number": "13",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-13",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/2"
    },
    {
      "path": "schedule/12/paragraph/14",
      "kind": "paragraph",
      "number": "14",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-14",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/2"
    },
    {
      "path": "schedule/12/paragraph/15",
      "kind": "paragraph",
      "number": "15",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-15",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/2"
    },
    {
      "path": "schedule/12/paragraph/16",
      "kind": "paragraph",
      "number": "16",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-16",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/2"
    },
    {
      "path": "schedule/12/part/3",
      "kind": "part",
      "number": "3",
      "heading": "FOR THE PROTECTION OF NATIONAL GRID ELECTRICITY TRANSMISSION PLC",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12"
    },
    {
      "path": "schedule/12/paragraph/17",
      "kind": "paragraph",
      "number": "17",
      "heading": "Application",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-17",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/18",
      "kind": "paragraph",
      "number": "18",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-18",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/19",
      "kind": "paragraph",
      "number": "19",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-19",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/20",
      "kind": "paragraph",
      "number": "20",
      "heading": "Apparatus of National Grid in streets subject to temporary prohibition or restriction",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-20",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/21",
      "kind": "paragraph",
      "number": "21",
      "heading": "Protective works to buildings",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-21",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/22",
      "kind": "paragraph",
      "number": "22",
      "heading": "Acquisition of land",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-22",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/23",
      "kind": "paragraph",
      "number": "23",
      "heading": "Removal of apparatus",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-23",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/24",
      "kind": "paragraph",
      "number": "24",
      "heading": "Facilities and rights for alternative apparatus",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-24",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/25",
      "kind": "paragraph",
      "number": "25",
      "heading": "Retained apparatus: protection of National Grid as Electricity Undertaker",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-25",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/26",
      "kind": "paragraph",
      "number": "26",
      "heading": "Expenses",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-26",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/27",
      "kind": "paragraph",
      "number": "27",
      "heading": "Indemnity",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-27",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/28",
      "kind": "paragraph",
      "number": "28",
      "heading": "Enactments and agreements",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-28",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/29",
      "kind": "paragraph",
      "number": "29",
      "heading": "Co-operation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-29",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/30",
      "kind": "paragraph",
      "number": "30",
      "heading": "Access",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-30",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/paragraph/31",
      "kind": "paragraph",
      "number": "31",
      "heading": "Arbitration",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-31",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/3"
    },
    {
      "path": "schedule/12/part/4",
      "kind": "part",
      "number": "4",
      "heading": "FOR THE PROTECTION OF NATIONAL GRID GAS PLC",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12"
    },
    {
      "path": "schedule/12/paragraph/32",
      "kind": "paragraph",
      "number": "32",
      "heading": "Application",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-32",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/33",
      "kind": "paragraph",
      "number": "33",
      "heading": "Interpretation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-33",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/34",
      "kind": "paragraph",
      "number": "34",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-34",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/35",
      "kind": "paragraph",
      "number": "35",
      "heading": "Apparatus of National Grid in streets subject to temporary prohibition or restriction",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-35",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/36",
      "kind": "paragraph",
      "number": "36",
      "heading": "Protective works to buildings",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-36",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/37",
      "kind": "paragraph",
      "number": "37",
      "heading": "Acquisition of land",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-37",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/38",
      "kind": "paragraph",
      "number": "38",
      "heading": "Removal of apparatus",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-38",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/39",
      "kind": "paragraph",
      "number": "39",
      "heading": "Facilities and rights for alternative apparatus",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-39",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/40",
      "kind": "paragraph",
      "number": "40",
      "heading": "Retained apparatus: protection of National Grid as Gas Undertaker",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-40",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/41",
      "kind": "paragraph",
      "number": "41",
      "heading": "Expenses",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-41",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/42",
      "kind": "paragraph",
      "number": "42",
      "heading": "Indemnity",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-42",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/43",
      "kind": "paragraph",
      "number": "43",
      "heading": "Enactments and agreements",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-43",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/44",
      "kind": "paragraph",
      "number": "44",
      "heading": "Co-operation",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-44",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/45",
      "kind": "paragraph",
      "number": "45",
      "heading": "Access",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-45",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/paragraph/46",
      "kind": "paragraph",
      "number": "46",
      "heading": "Arbitration",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-46",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/4"
    },
    {
      "path": "schedule/12/part/5",
      "kind": "part",
      "number": "5",
      "heading": "FOR THE PROTECTION OF NORTHERN POWERGRID (YORKSHIRE) PLC AND NORTHERN POWERGRID LIMITED",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12"
    },
    {
      "path": "schedule/12/paragraph/47",
      "kind": "paragraph",
      "number": "47",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-47",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/48",
      "kind": "paragraph",
      "number": "48",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-48",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/49",
      "kind": "paragraph",
      "number": "49",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-49",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/50",
      "kind": "paragraph",
      "number": "50",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-50",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/51",
      "kind": "paragraph",
      "number": "51",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-51",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/52",
      "kind": "paragraph",
      "number": "52",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-52",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/53",
      "kind": "paragraph",
      "number": "53",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-53",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/54",
      "kind": "paragraph",
      "number": "54",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-54",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/55",
      "kind": "paragraph",
      "number": "55",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-55",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/56",
      "kind": "paragraph",
      "number": "56",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-56",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/57",
      "kind": "paragraph",
      "number": "57",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-57",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/58",
      "kind": "paragraph",
      "number": "58",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-58",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/59",
      "kind": "paragraph",
      "number": "59",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-59",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/60",
      "kind": "paragraph",
      "number": "60",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-60",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/61",
      "kind": "paragraph",
      "number": "61",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-61",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/62",
      "kind": "paragraph",
      "number": "62",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-62",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/12/paragraph/63",
      "kind": "paragraph",
      "number": "63",
      "heading": null,
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-12/paragraph-63",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/12/part/5"
    },
    {
      "path": "schedule/13",
      "kind": "schedule",
      "number": "13",
      "heading": "DESIGN PARAMETERS",
      "url": null,
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "schedule/13/part/1",
      "kind": "part",
      "number": "1",
      "heading": "TEMPORARY CONSTRUCTION PARAMETERS",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-13/part-1",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13"
    },
    {
      "path": "schedule/13/part/2",
      "kind": "part",
      "number": "2",
      "heading": "UNIT X PARAMETERS",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-13/part-2",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13"
    },
    {
      "path": "schedule/13/part/3",
      "kind": "part",
      "number": "3",
      "heading": "UNIT Y PARAMETERS",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-13/part-3",
      "extent": "E+W",
      "status": null,
      "parent": "schedule/13"
    },
    {
      "path": "schedule/14",
      "kind": "schedule",
      "number": "14",
      "heading": "DOCUMENTS AND PLANS TO BE CERTIFIED",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-14",
      "extent": "E+W",
      "status": null,
      "parent": null
    },
    {
      "path": "note",
      "kind": "note",
      "number": null,
      "heading": "Explanatory note",
      "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/note",
      "extent": "E+W",
      "status": null,
      "parent": null
    }
  ],
  "outstanding_effects": [],
  "made_under": [],
  "changes_made_to": 161,
  "changes_made_to_url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/changes.json",
  "changes_made_by": 193,
  "changes_made_by_url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/changes/by-it.json",
  "instruments_made_under": 0,
  "instruments_made_under_url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/instruments.json",
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2019/1315",
    "retrieved_at": "2026-10-28T22:36:58.505253+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}