  "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper10n1",
  "json_url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper10n1.json",
  "legislation": "uksi/2019/1315",
  "legislation_title": "The Drax Power (Generating Stations) Order 2019",
  "legislation_url": "https://openlegislation.uk/drax-power-generating-stations-order-2019",
  "path": "schedule/1/paragraph/wrapper10n1",
  "kind": "paragraph",
  "number": null,
  "heading": null,
  "text": "Work No. 8 – electrical connections including—\n(a) Work No. 8A (in connection with Unit X) – up to 400 kilovolt underground electrical connection between Work No. 4A and the existing 400 kilovolt National Grid substation busbars—\n(i) electrical underground cables and telemetry and electrical protection auxiliary cabling;\n(ii) one set of cable sealing ends;\n(iii) insulated switchgear and overhead busbars;\n(iv) trenching works;\n(v) site drainage;\n(vi) security and site lighting infrastructure, including cameras, perimeter fencing and lighting columns; and\n(vii) hard and soft landscaping including ecological mitigation.\n(b) Work No. 8B (in connection with Unit Y) – up to 400 kilovolt underground electrical connection between Work No. 4B and the existing 400 kilovolt National Grid substation busbars of either—\n(i) electrical underground cables and telemetry and electrical protection auxiliary cabling;\n(ii) one set of cable sealing ends;\n(iii) insulated switchgear and overhead busbars;\n(iv) trenching works;\n(v) site drainage;\n(vi) security and site lighting infrastructure, including cameras, perimeter fencing and lighting columns; and\n(vii) hard and soft landscaping including ecological mitigation;\nOr—\n(viii) electrical underground cables and telemetry and electrical protection auxiliary cabling;\n(ix) a 400 kilovolt cable sealing end compound—\n(aa) one set of cable sealing ends;\n(bb) air insulated switchgear and overhead busbars; and\n(cc) overhead conductor gantry, overhead conductors and other plant and structures required to manage the transmission of electricity;\n(x) trenching works;\n(xi) site drainage;\n(xii) security and site lighting infrastructure, including cameras, perimeter fencing and lighting columns; and\n(xiii) hard and soft landscaping including ecological mitigation.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 in force at 25.10.2019, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2019/1315/schedule/1/paragraph/wrapper10n1",
    "retrieved_at": "2026-10-28T22:36:58.505253+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}