{
  "url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper3n1",
  "json_url": "https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper3n1.json",
  "legislation": "uksi/2019/1315",
  "legislation_title": "The Drax Power (Generating Stations) Order 2019",
  "legislation_url": "https://openlegislation.uk/drax-power-generating-stations-order-2019",
  "path": "schedule/1/paragraph/wrapper3n1",
  "kind": "paragraph",
  "number": null,
  "heading": null,
  "text": "Work No. 1 – an electricity generating station (Unit X) fuelled by natural gas and with a gross electrical output capacity of up to 1,800 megawatts including—\n(a) Work No. 1A – a gas generating unit comprising—\n(i) up to two gas turbines able to operate in both combined cycle and open cycle modes;\n(ii) one turbine hall building for the gas turbines within this Work;\n(iii) up to two heat recovery steam generators;\n(iv) up to two heat recovery steam generator buildings and up to two exhaust gas emission flue stacks for the heat recovery steam generators within this Work;\n(v) up to two bypass stacks;\n(vi) transformers;\n(vii) gas turbine air inlet filter house;\n(viii) power control centre;\n(ix) feed water pump house building;\n(x) water supply and pipelines;\n(xi) water storage tanks and pipelines;\n(xii) emergency diesel generator and diesel fuel tank for safe shut-down of the plant;\n(xiii) switch gear and ancillary equipment;\n(xiv) up to two turbine outage store buildings;\n(xv) 400 kilovolt electrical underground cables and telemetry and electrical protection auxiliary cabling connecting to Work No. 4A; and\n(xvi) a new main fuel gas station comprising up to two individual fuel gas stations comprising for each—\n(aa) a gas receiving area;\n(bb) gas treatment and control facilities including filters, preheating and liquid collection tanks; and\n(cc) other auxiliary control cabinets.\n(b) Work No. 1B\n(i) a new main pipe rack carrying main steam and condensate, and auxiliary cabling and pipework between the heat recovery steam generators and the existing steam turbine;\n(ii) piling for foundations to accommodate the pipe rack including in connection with the pipe rack comprising part of Work No. 2B; and\n(iii) modifications to the existing steam turbine, generating plant and turbine hall building.\n(c) Work No. 1C – a new underground gas pipeline across New Road connecting Work No. 1A to Work No. 5.\n(d) Work No. 1D – in connection with and in addition to Work Nos. 1A, 1B and 1C—\n(i) works connecting Work Nos. 1A, 1B and 1C to existing equipment and utilities;\n(ii) ground raising and ground preparation works;\n(iii) site lighting infrastructure, including perimeter lighting columns;\n(iv) internal roadways, car parking, pedestrian network, cycle parking and hardstanding;\n(v) site drainage and waste management infrastructure, including relocation of existing infrastructure as required;\n(vi) electricity (including a 132 kilovolt electricity cable across New Road connecting Work No. 1A to Work No.5), water, wastewater and telecommunications and other services; and\n(vii) hard and soft landscaping including tree planting, ecological mitigation, temporary and permanent fencing and other boundary treatments.",
  "extent": "E+W",
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "I",
      "label": "I1",
      "text": "Sch. 1 in force at 25.10.2019, see art. 1"
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2019/1315/schedule/1/paragraph/wrapper3n1",
    "retrieved_at": "2026-10-28T22:36:58.505253+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}