# The Drax Power (Generating Stations) Order 2019, Paragraph

Extent: E+W

Work No. 4 – new gas insulated switchgear banking buildings including—
(a) Work No. 4A (in connection with Unit X)—
(i) a building containing gas insulated switchgear and other associated switch gear and ancillary equipment;
(ii) a building containing control equipment;
(iii) up to three sets of cable sealing ends; and
(iv) ground raising and ground preparation works.
(b) Work No. 4B (in connection with Unit Y)—
(i) a building or an extension to the building in Work No. 4A containing gas insulated switchgear and other switch gear and ancillary equipment;
(ii) up to three sets of cable sealing ends; and
(iii) ground raising and ground preparation works.

---
Source: https://www.legislation.gov.uk/uksi/2019/1315/schedule/1/paragraph/wrapper6n1 (the official version)
Page: https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper6n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.