# The Drax Power (Generating Stations) Order 2019, Paragraph

Extent: E+W

Work No. 5 – a natural gas receiving facility compound including—
(a) pipeline inspection gauge (PIG) trap receiving equipment;
(b) isolation valves, inline valves, metering, heat exchangers, filtering, pressure regulation equipment, pipework;
(c) electricity supply kiosks and associated cabling;
(d) emergency generator;
(e) electrical pre-heaters and electrical compressors housed in a building;
(f) up to two boiler houses with a total installed thermal input capacity to the heat exchangers of 7.2 megawatts and each boiler house with up to two stacks;
(g) control and instrumentation kiosks and associated wiring;
(h) creation of a permanent access from New Road including permanent road surface and kerb stones, signing and road markings works, drainage, car parking, fencing and other incidental works;
(i) security infrastructure, including cameras, lighting (including perimeter lighting columns), stock proof fencing and perimeter fencing;
(j) a new underground gas pipeline;
(k) external cooling system;
(l) ground raising and ground preparation works; and
(m) hard and soft landscaping including tree planting, ecological mitigation, temporary and permanent fencing and other boundary treatments.

---
Source: https://www.legislation.gov.uk/uksi/2019/1315/schedule/1/paragraph/wrapper7n1 (the official version)
Page: https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper7n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.