Work No. 7 – a gas pipeline including—
(a) Work No. 7A—
(i) an underground gas pipeline connection and telemetry cabling, 3km in length and up to 600 millimetres nominal diameter, connecting Work No. 5 to Work No. 6B;
(ii) pipeline field marker posts and cathodic protection test/transformer rectifier units;
(iii) below ground drainage works;
(iv) works required in order to protect existing utilities infrastructure;
(v) tree and hedge removal; and
(vi) hard and soft landscaping including tree planting, ecological mitigation, temporary and permanent fencing and other boundary treatments.
(b) Work No. 7B – temporary construction laydown area for gas pipeline.

---
Source: https://www.legislation.gov.uk/uksi/2019/1315/schedule/1/paragraph/wrapper9n1 (the official version)
Page: https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-1/paragraph-wrapper9n1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.