# The Drax Power (Generating Stations) Order 2019, Part 1: TEMPORARY CONSTRUCTION PARAMETERS

Extent: E+W

Table 12
Component
Work No.
Maximum length (m)
Maximum width (m)
Maximum height (m AGL)
Maximum height (m AOD)
Pedestrian Bridge
9A(iii)
33
10
11.5
17

---
Source: https://www.legislation.gov.uk/uksi/2019/1315/schedule/13/part/1 (the official version)
Page: https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-13/part-1
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

