# The Drax Power (Generating Stations) Order 2019, Part 3: UNIT Y PARAMETERS

Extent: E+W

Table 15
Component
Work No.
Maximum length (m)
Maximum width (m)
Maximum height (m AGL)
Maximum height (m AOD)
Turbine hall building
2A(ii)
92
23
28
34
Heat recovery steam generator building (up to two)
2A(iv)
55
29
49
55
Exhaust gas emission flue stacks (up to two)
2A(iv)
–
–
123
129
Bypass stack (up to two)
2A(v)
–
–
123
129
Transformers
2A(vi)
36
20
11
17
Gas turbine air inlet filter house
2A(vii)
26
27
35
41
Power control centre
2A(viii)
17
17
6
12
Fuel gas station (up to two)
2A(xv)
26
19
7
13
Main pipe rack
2B(i)
1100
12
25
31
Battery storage facility including any structure (where constructed in two stages being stage 1 and stage 2)
3B
90
60
10
16
Gas insulated switchgear banking building or extension to 4A building
4B
18
12
11
17
Sludge lagoon (up to two)
12B
82
55
–
–
Cable Sealing End Compound
8B(ii)
35
28
20
26
Table 16
Component
Work No.
Minimum height (m AGL)
Minimum height (m AOD)
Exhaust gas emission flue stack (up to two)
2A(iv)
122.5
128.5
Bypass stack (up to two)
2A(v)
122.5
128.5

---
Source: https://www.legislation.gov.uk/uksi/2019/1315/schedule/13/part/3 (the official version)
Page: https://openlegislation.uk/drax-power-generating-stations-order-2019/schedule-13/part-3
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.