# The Drax Power (Generating Stations) Order 2019, Paragraph 7: Detailed design approval

Extent: E+W

(1) In relation to any part of the authorised development comprised in numbered work 1, no development of that part may commence until details of the following for that part have been submitted to and, in respect of the matters referred to in paragraph (d) after consultation with the highway authority, approved by the relevant planning authority—
(a) the siting, layout, scale and external appearance, including colour, materials and surface finishes of all new permanent buildings and structures;
(b) finished floor levels;
(c) hard standings; and
(d) the internal vehicular access and circulation roads, vehicle parking, cycle parking and routes, and pedestrian facilities and routes.
(2) In relation to any part of the authorised development comprised in numbered work 2, no development of that part may commence until details of the following for that part have been submitted to and, in respect of the matters referred to in paragraph (d) after consultation with the highway authority, approved by the relevant planning authority—
(a) the siting, layout, scale and external appearance, including colour, materials and surface finishes of all new permanent buildings and structures;
(b) finished floor levels;
(c) hard standings; and
(d) the internal vehicular access and circulation roads, vehicle parking, cycle parking and routes, and pedestrian facilities and routes.
(3) In relation to any part of the authorised development comprised in numbered work 3A, no development of that part may commence until details of the following for that part have been submitted to and approved by the relevant planning authority—
(a) the siting, layout, scale and external appearance, including colour, materials and surface finishes of all new permanent buildings and structures including any cladding or shield to enclose or protect the battery energy storage cells;
(b) finished floor levels;
(c) flood mitigation channel;
(d) hard standings; and
(e) the internal vehicular access and circulation roads.
(4) In relation to any part of the authorised development comprised in numbered work 3B, no development of that part may commence until details of the following for that part have been submitted to and approved by the relevant planning authority—
(a) the siting, layout, scale and external appearance, including colour, materials and surface finishes of all new permanent buildings and structures including any cladding or shield to enclose or protect the battery energy storage cells;
(b) finished floor levels;
(c) hard standings; and
(d) the internal vehicular access and circulation roads.
(5) In relation to any part of the authorised development comprised in numbered work 4A, no development of that part may commence until details of the following for that part have been submitted to and, in respect of the matters referred to in paragraph (e) after consultation with the highway authority, approved by the relevant planning authority—
(a) the siting, layout, scale and external appearance, including colour, materials and surface finishes of all new permanent buildings and structures;
(b) finished floor levels;
(c) hard standings;
(d) security infrastructure; and
(e) the internal vehicular access, circulation roads and vehicle parking.
(6) In relation to any part of the authorised development comprised in numbered work 4B, no development of that part may commence until details of the following for that part have been submitted to and, in respect of the matters referred to in paragraph (e) after consultation with the highway authority, approved by the relevant planning authority—
(a) the siting, layout, scale and external appearance, including colour, materials and surface finishes of all new permanent buildings and structures;
(b) finished floor levels;
(c) hard standings;
(d) security infrastructure; and
(e) the internal vehicular access, circulation roads and vehicle parking.
(7) In relation to any part of the authorised development comprised in numbered work 5, no development of that part may commence until details of the following for that part have been submitted to and, in respect of the matters referred to in paragraph (e) after consultation with the highway authority, approved by the relevant planning authority—
(a) the siting, layout, scale and external appearance, including colour, materials and surface finishes of all new permanent buildings and structures;
(b) finished floor levels;
(c) hard standings;
(d) security infrastructure; and
(e) the internal vehicular access, circulation roads and vehicle parking.
(8) In relation to any part of the authorised development comprised in numbered work 6, no development of that part may commence until details of the following for that part have been submitted to and, in respect of the matters referred to in paragraph (f) after consultation with the highway authority, approved by the relevant planning authority—
(a) the siting, layout, scale and external appearance, including colour, materials and surface finishes of all new permanent buildings and structures;
(b) finished floor levels;
(c) hard standings;
(d) the size of the culvert in numbered work 6A(ix);
(e) security infrastructure; and
(f) the internal vehicular access, circulation roads and vehicle parking.
(9) In relation to the pedestrian bridge in numbered work 9A, no development of any part of the pedestrian bridge may commence until the undertaker has submitted to the highway authority for approval detailed design and safety drawings of the pedestrian bridge.
(10) The authorised development must be carried out in accordance with the design parameters.
(11) Numbered works 1, 2, 3, 4, 5, 6 and 9A must be carried out in accordance with the approved details under this Requirement.

---
Source: https://www.legislation.gov.uk/uksi/2019/1315/schedule/2/paragraph/7 (the official version)