# The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024, Article 35: Operational land for purposes of the 1990 Act


Development consent granted by this Order is to be treated as specific planning permission for the purposes of section 264(3)(a) (cases in which land is to be treated as operational land) of the 1990 Act.

---
Source: https://www.legislation.gov.uk/uksi/2024/70/article/35 (the official version)
Page: https://openlegislation.uk/drax-power-station-bioenergy-with-carbon-capture-and-storage-extension-order-2024/article-35
Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives.

