{
  "url": "https://openlegislation.uk/drax-power-station-bioenergy-with-carbon-capture-and-storage-extension-order-2024/schedule-12/paragraph-38",
  "json_url": "https://openlegislation.uk/drax-power-station-bioenergy-with-carbon-capture-and-storage-extension-order-2024/schedule-12/paragraph-38.json",
  "legislation": "uksi/2024/70",
  "legislation_title": "The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024",
  "legislation_url": "https://openlegislation.uk/drax-power-station-bioenergy-with-carbon-capture-and-storage-extension-order-2024",
  "path": "schedule/12/paragraph/38",
  "kind": "paragraph",
  "number": "38",
  "heading": "General",
  "text": "Notwithstanding the limits of deviation permitted pursuant to article 3 (development consent etc. granted by this Order) of this Order, no works in carrying out, maintaining or diverting the authorised development may be carried out under or over the strategic road network at a distance within 4 metres of the lowest point of the ground.",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/70/schedule/12/paragraph/38",
    "retrieved_at": "2026-10-28T21:35:45.832365+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}