{
  "url": "https://openlegislation.uk/drax-power-station-bioenergy-with-carbon-capture-and-storage-extension-order-2024/schedule-14/part-2",
  "json_url": "https://openlegislation.uk/drax-power-station-bioenergy-with-carbon-capture-and-storage-extension-order-2024/schedule-14/part-2.json",
  "legislation": "uksi/2024/70",
  "legislation_title": "The Drax Power Station Bioenergy with Carbon Capture and Storage Extension Order 2024",
  "legislation_url": "https://openlegislation.uk/drax-power-station-bioenergy-with-carbon-capture-and-storage-extension-order-2024",
  "path": "schedule/14/part/2",
  "kind": "part",
  "number": "2",
  "heading": "DESIGN PARAMETERS ASSOCIATED WITH THE CARBON CAPTURE PLANT FOR UNIT 2",
  "text": "(1)\nComponent / Building / Area\n(2)\nWork No.\n(3)\nMaximum number\n(4)\nMaximum length (m)\n(5)\nMaximum width (m)\n(6)\nMaximum height (m AGL)\n(7)\nMaximum height (m AOD)\n(1) Component to be located at elevation (i.e. located within the duct). Height stated is the maximum height component could be AGL.\n(2) Building / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked.\n(3) The Rich Solvent / Lean Solvent Heat Exchangers would be located at elevation on the Main Process and Service Rack.\nGas / Gas Heat Exchanger\n1D(vi)(aa)\n2\n25\n25\n45\n51.1\nQuench Column\n1D(ii)(aa)\n1\n50\n30\n40\n46.1\nAbsorber Column\n1D(ii)(bb)\n1\n50\n30\n95\n101.1\nRegenerator\n1D(iv)(aa)\n2\n15\n15\n70\n76.1\nCarbon Dioxide Gas Compressor Building\n1E(ii)\n4\n45\n40\n30\n36.1\nCarbon Dioxide Main Vent Stacks\n1E(iv)\n1\n10\n10\n30\n36.1\nMain Process & Service Rack\n1D(iv)\n1\n150\n20\n25\n31.1",
  "extent": null,
  "status": null,
  "version": "current",
  "annotations": [
    {
      "type": "footnote",
      "label": "f1",
      "text": "(1) Component to be located at elevation (i.e. located within the duct). Height stated is the maximum height component could be AGL."
    },
    {
      "type": "footnote",
      "label": "f2",
      "text": "(2) Building / Structures may be coupled together. Total building volume will however not exceed volume required for maximum number of buildings. Maximum height stated is for all configurations. Switchrooms may also be double stacked."
    },
    {
      "type": "footnote",
      "label": "f3",
      "text": "(3) The Rich Solvent / Lean Solvent Heat Exchangers would be located at elevation on the Main Process and Service Rack."
    }
  ],
  "outstanding_effects": [],
  "provenance": {
    "source": "legislation.gov.uk",
    "source_url": "https://www.legislation.gov.uk/uksi/2024/70/schedule/14/part/2",
    "retrieved_at": "2026-10-28T21:35:45.832365+00:00"
  },
  "licence": "Open Government Licence v3.0",
  "licence_url": "https://www.nationalarchives.gov.uk/doc/open-government-licence/version/3/",
  "attribution": "Contains public sector information licensed under the Open Government Licence v3.0. Source: legislation.gov.uk, The National Archives."
}